Question

My question is to write a method specification related to any Labour Intensive Construction Project

My question is to write a method specification related to any Labour Intensive Construction Project

Homework Answers

Answer #1

● First the method specification is the word which includes selection of materials and process of construction.

So the method specifications of any labour intensive construction generally throughout the construction process, includes the production of materials which they want in their process of construction– to produce as high a standard of construction as demanded by the owner. So by this they produce the wanted material and the selection of materials process is completed.

Then in the process of construction the masons and labours or skilled labours generally worked together and do the construction work and build the project.

Thank you.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
I have senior design class. My project is Rubik's Cube Solver. We are going to solve...
I have senior design class. My project is Rubik's Cube Solver. We are going to solve internal that means everything inside the cube. My professor ask us about feasibility analysis. Question: Assumptions: Analysis: I have to find question is related for our project and write assumptions and then analysis.
If my question for a research project is "does sleep deprivation increase tantrums in toddlers during...
If my question for a research project is "does sleep deprivation increase tantrums in toddlers during their playtime?"what would be my construct and the operational definition
Write an article titled “The environmental variables affecting labour relations in the south African workplace: 2016”...
Write an article titled “The environmental variables affecting labour relations in the south African workplace: 2016” Concentrate on any four variables. Picture a CMPT factory, with lots of sewing machines on the production floor and workers. Please note this is a 20 mark question.
Q1- Design and write about any IT project scope statement.    Q2- Develop project plan and...
Q1- Design and write about any IT project scope statement.    Q2- Develop project plan and estimate project duration and budget.
Q1: Think of a construction project-a multi-lane long-span bridge over a wadi crossing. Write down the...
Q1: Think of a construction project-a multi-lane long-span bridge over a wadi crossing. Write down the steps involved in its planning and the steps involved in its scheduling.
research study: Impact of Variation Order in Construction Project Question: give me some specific objective (inquiries...
research study: Impact of Variation Order in Construction Project Question: give me some specific objective (inquiries which are expected to achieve in the study)
The board of directors for Apache Construction Corp. is meeting to choose between the completed-contract method...
The board of directors for Apache Construction Corp. is meeting to choose between the completed-contract method and the percentage-of-completion method of accounting for long-term contracts in the company's financial statements. You have been engaged to assist Apache’s controller in the preparation of a presentation to be given at the board meeting. The controller provides you with the following information: ·        Apache commenced doing business on January 1, 2020. ·        Construction activities for the year ended December 31, 2020, were as follows: Project...
Question 1 (16 marks) EC Interior Design and Construction Company Limited (“EC”) is a private company...
Question 1 EC Interior Design and Construction Company Limited (“EC”) is a private company in Hong Kong specializing in residential and commercial interior design. It was founded by Mr Eagle Chan, an interior designer. For each project, Eagle first draws the design according to the client’s request. Then a team of construction workers complete the refurbishment. Eagle follows up the project and makes any necessary adjustment to his original design if the construction team meet any difficulty or if the...
Write an MLA 500-word essay response to the following question: Describe the critical policy issues related...
Write an MLA 500-word essay response to the following question: Describe the critical policy issues related to access to care, cost of care, and quality of care.
Question: I had a group project for my class where we asked 45 people if they...
Question: I had a group project for my class where we asked 45 people if they preferred bottled or tap water. Results were: 11 preferred tap, 34 preferred bottled Margin of Error was: H0: P1 = P2 (CLAIM) HA: P1 ? P2 (Our hypothesis claimed that there was no difference in taste, people preferred each one equally) How would I go about constructing AND graphing a confidence interval and finding the standard deviation for my results? I'm confused.