The 12.3km Atta Mills road connecting Old Barrier to Kokrobite
operates with a
capacity of 2200 pcu/hr and can be traversed within 15 minutes
under free flow
conditions. If a flow of 3200 pcu/hr is assigned to the road based
on the capacityrestrained approach, what would be the resultant
travel time after the traffic assignment
process (AN,5)
Capacity restrained traffic assignment attempts to initially start with all or nothing and then reiterates to re-distribute traffic by iterating between all or nothing and re-calculating link travel times
For capacity restrained, the relationship between linkflow, link impedance is given by
where
t = travel time on the link
x = flow on the link
t0 = free fow travel time
k = practical capacity
and are parameters which need to be calibrated based on field observations. default values in absence of anything else can be assumed as =0.15 and = 4
So in our case we know t0 = 15 minutes = 0.25 hours, k = 2200
so we have t = 0.25 * (1 + * (3200/2200))
assume =0.15 and = 4
so we have t = 0.25 * (1 + .15*(3200/2200)4) = 0.4178 hours = 25.068 minutes
so travel time after the assignment = 25.068 minutes
---------------------------------------------------------------------------------------------------------------------------------------