as an engineer in consultancy firm, you need to propose a site investigation method to construct new hospital at pontian,johor. the area was underlain by soft clay deposits with 500 m and 350 m in size.the hospital consists of 3 numbers of 4 storey buildings, 3 numbers of 2 storey building, 2 numbers of single storey building and also parking area. your proposal should include number of borings, depth of borings,type of sampling(should include disturbed and undisturbed samples) and also testing involved(in - situ and laboratory testing)
Get Answers For Free
Most questions answered within 1 hours.