Question

A 10 m layer of sand overlies a 6 m layer of saturated clay, below which...

  1. A 10 m layer of sand overlies a 6 m layer of saturated clay, below which there is impermeable rock. For the clay, cv = 4.4 m2/yr. The ultimate consolidation settlement for a given surface loading was determined to be sc = 18 cm.

    1. a) How long will it take for 95% of the consolidation settlement to be completed?

    2. b) What will be the magnitude of settlement 1 year after the load is applied?

    3. c) How long will it take for 9 cm of settlement to occur?

Homework Answers

Answer #1

Please give rating

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider a 20 foot thick saturated clay that has a sand layer above it and an...
Consider a 20 foot thick saturated clay that has a sand layer above it and an impermeable rock layer below it. The clay layer has an initial effective stress at its midpoint of 3145 lbs/ft2.    Due to the presence of a large water tank on the surface, the stress is increased by 710 lbs/ft2 at the midpoint of the clay layer. How much total settlement from primary consolidation is expected? Provide your answer in inches. Soil properties: Compression index = .324,...
At a reclamation site, a 6-m thick sand layer overlies a 5.8-m thick clay layer, which...
At a reclamation site, a 6-m thick sand layer overlies a 5.8-m thick clay layer, which is underlain by impermeable rock stratum. The water level is initially 2.5 m above the ground surface. The saturated unit weights of sand and clay are 19 kN/m3 and 17 kN/m3, respectively. A 5-m thick layer of fill will be placed on the original ground surface, and the unit weights of fill are 19 kN/m3 and 20 kN/m3 above and below water table, respectively....
The ultimate consolidation of a 13-ft thick single-drained clay layer (cv = 0.1 ft2/day) was calculated...
The ultimate consolidation of a 13-ft thick single-drained clay layer (cv = 0.1 ft2/day) was calculated to be 0.813 feet. a. What is the average degree of consolidation for the clay layer when the settlement is 2 inches? b. If the average value for cv for the pressure range is 0.003 cm2/second how long will it take for 50% settlement to occur? (be careful on the units) c. If the 17 ft clay layer is drained on one side, how...
A layer of clay 2 meters thick will settle 44 mm under an applied load. Calculate...
A layer of clay 2 meters thick will settle 44 mm under an applied load. Calculate how long it will take to achieve 30% of the total settlement if the coefficient of consolidation is 0.00026 cm2/s and the clay layer can drain from the top only. Provide your answer in units of days as a whole number.
Consider a clay layer that is 1 m thick. The clay has a compression index of...
Consider a clay layer that is 1 m thick. The clay has a compression index of 0.35, a swell index of 0.07, a permeability of 4 x 10-7 cm/sec, a preconsolidation pressure of 172 kPa and a coefficient of consolidation of 2.7 x 10-4 cm2/min. The initial effective stress at the midpoint of the layer is 140 kPa, and the soil has a void ratio of 1.01. The stress is increased to 200 kPa. The soil is drained above and...
You should use excel functions and capabilities to solve the problem. Inputs and outputs should be...
You should use excel functions and capabilities to solve the problem. Inputs and outputs should be clear using different colours. There is no mark for copying and pasting the solution. please provide step by step formulas to conpute in excel Q3 A rigid strip footing with a width of B is constructed above the ground on a clay deposit, overlying bedrock. The depth of clay layer is H and the water level is at the natural ground surface. Before construction...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT