Calculate the total settlement of the landfill at the end of the 10th month (in % of the initial height). The filling sequence is listed in the following table. Please consider the settlements of the layers individually.
Time period |
Initial thickness of the waste layer (m) |
Assume the following:
|
||
1st month |
4.2 |
|||
2nd month |
5.2 |
|||
3rd month |
4.6 |
|||
4th month |
6.8 |
|||
5th month |
6.5 |
|||
6th month |
6.4 |
|||
7th month |
4.3 |
|||
8th month |
4.5 |
|||
9th month |
4.7 |
|||
10th month |
5.1 |