Question

A contractor plans to use a crawler tractor that is being used to move 5,000 BCY...

A contractor plans to use a crawler tractor that is being used to move 5,000 BCY of soil 500 feet horizontally in a 50 minute working hour. The soil has a swell of 15%. The tractor has a straight blade 10 feet long and 4 feet high. The average width of the base of the soil pile in front of the blade has been measured to be about 5 feet. Assume that the tractor travels in first gear forward at 2.2 miles per hour and returns in a second reverse gear at 3.4 miles per hour. The total ownership and operating cost of the tractor is $55.00 per hour. Use a fixed time of .10 minutes. Remember that the tractor will be moving the dirt in its loose state. What is the productivity of the tractor in LCY per hour?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet...
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet using a 50-minute working hour. The soil has a swell of 15%. The loader has a bucket capacity of 2.5 cubic yards. The soil has a fill factor of 1.2 and a weight of 2,500 lbs per LCY. The loader has an STL of 50% of 15,000 lbs. The loader will haul in one direction loaded at 2.5 miles per hour and return at...
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet...
A contractor plans to use a wheeled loader to move 5,000 BCY of soil 500 feet using a 50-minute working hour. The soil has a swell of 15%. The loader has a bucket capacity of 2.5 cubic yards. The soil has a fill factor of 1.2 and a weight of 2,500 lbs per LCY. The loader has an STL of 50% of 15,000 lbs. The loader will haul in one direction loaded at 2.5 miles per hour and return at...
A contractor wants to explore using a 7U blade on a 240 hp dozer. The material...
A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT