Question

You are tasked with conducting BOD studies for a waste treatment facility and its discharge to...

You are tasked with conducting BOD studies for a waste treatment facility and its discharge to a nearby river. You are told that the facility removes 93% of the BOD in total with a discharge rate of 1.0 m3 /s. you sample the receiving water and find that it has a 0.5 mg/L deficit from saturation concentration (saturation is at 9.7 mg/L) and a BOD5 content of 10 mg/L. The river flows at a speed of 0.25 m/s and has a flow rate of 9.0 m3 /s. The reaeration constant is known to be 0.49 d-1 , and the deoxygenation constant for the river is 0.20 d-1 .

a. In a 5-day BOD test of untreated wastewater in a 300 mL bottle, you measure an initial DO of 9.7 mg/L and a final DO of 3.4 mg/L. If the dilution factor was 0.025, what is the BOD concentration in the influent wastewater?

b. What is the largest volume of treated wastewater that you can use to test the BOD in the effluent, if you must have at least 2.0 mg/L of DO in the bottle after 5 days?

c. Assuming complete and instantaneous mixing, estimate the ultimate BOD of the river just downstream of the outfall.

d. If the stream has a cross-section that is approximately constant, flowing at a fixed speed, estimate the BOD remaining in the stream at a distance of 25 km downstream.

e. Estimate the oxygen deficit in the river just downstream of the outfall (assume the wastewater is aerated to saturation).

f. How far downstream will the DO reach a minimum? g. What is the largest DO deficit that can be expected in the stream?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to...
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to a nearby river. You are told that the facility removes 93% of the BOD in total with a discharge rate of 1.0 m3 /s. you sample the receiving water and find that it has a 0.5 mg/L deficit from saturation concentration (saturation is at 9.7 mg/L) and a BOD5 content of 10 mg/L. The river flows at a speed of 0.25 m/s and has...
8. A wastewater has a dissolved oxygen concentration of 2.0 mg/L and a discharge rate of...
8. A wastewater has a dissolved oxygen concentration of 2.0 mg/L and a discharge rate of 1.1 m3/s. The river into which it is being discharged has DO equal to 8.3 mg/L, a flow rate of 1.4 m3/s and a temperature of 200C. Assuming complete and instantaneous mixing, estimate the initial dissolved oxygen deficit of the mixture of wastewater and river water just downstream from the discharge point. The saturated valued of DO at 200C is 9.1 mg/L.
A waste stream has a dissolved oxygen concentration of 1.5 mg/L, a flow of 0.5 m3...
A waste stream has a dissolved oxygen concentration of 1.5 mg/L, a flow of 0.5 m3 /s, a temperature of 26°C, and an ultimate BOD (or BODu) of 48 mg/L. The waste stream is discharged into a river that is running at 2.2 m3 /s at a saturated DO, a temperature of 12°C, and an ultimate BOD of 1.6 mg/L. A) Calculate the mixing (a) temperature and (b) ultimate BOD for the river water immediately after discharge of the waste...
The City of Columbus recently issued an NPDES permit to a beer brewery discharging wastewater at...
The City of Columbus recently issued an NPDES permit to a beer brewery discharging wastewater at a flowrate of 0.15 m3/sec into Buckeye Creek (flowrate = 0.25 m3/sec), such that BOD5 of immediately after discharge must not exceed 2.5 mg/L. Upstream of the discharge, BOD5 in Buckeye Creek was measured at 1.5 mg/L. BOD decay rate constants were measured separately for the upstream creek (k = 2 d-1), the wastewater effluent (k = 0.2 d-1), and the downstream creek after...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a community of 45,000 people has a flow of 100 gal/person/day and a BOD5 loading of 0.2 lb/person/day. The upstream characteristics of the receiving waters are: stream flow rate = 20 cfs and BOD5 = 2 mg/L The water quality standards require the in-stream BOD5 to be less than 7 mg/L in this stretch of the river. The minimum BOD removal efficiency that the treatment...
A paper mill generates 0.087 m3/s of wastewater which has an ultimate BOD of 720 mg/L....
A paper mill generates 0.087 m3/s of wastewater which has an ultimate BOD of 720 mg/L. The reaction rate constant at 20 °C was determined to be 6.48 hr-1. (a) Determine the BOD exerted in the water after 5 days at 20 °C (units: mg/L) a) 1066 b) 533 c) 333 d)720 (b) Determine the BOD exerted in the water after 5 days at 10 °C (units: mg/L)                             a)533 b) 227 c)...
A wastewater treatment plant disposes of its effluent in a surface stream. Characteristics of the stream...
A wastewater treatment plant disposes of its effluent in a surface stream. Characteristics of the stream and effluent are given in the table below. What will be the dissolved oxygen concentration in the stream after 2.0 days? (10 Points) What will be the lowest dissolved oxygen concentration as a result of the waste discharge? (10 Points) Parameter Wastewater Stream Flow, m3/s 0.2 5.0 Dissolved Oxygen, mg/L 1.0 8.0 Temperature, o C 15.0 20.2 BOD5 at 20oC, mg/L 100 2.0 k1...
A beverage manufacturer has recently commissioned a 500 m3 aerated tank to biologically treat 4×105 L/d...
A beverage manufacturer has recently commissioned a 500 m3 aerated tank to biologically treat 4×105 L/d of wastewater prior to discharge. The tank is a single–pass configuration not catering for recycle. Regulations are particularly stringent requiring that the discharged waste not exceed 10 mg BOD/L owing to the sensitive receiving environment. You have been specifically asked to determine whether the current tank volume is adequate. If not, determine the maximum flow that can be treated while still meeting the BOD...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant (WWTP) to a secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 30 mg/L suspended solids. They have selected a completely mixed activated sludge system for the upgrade. The existing primary treatment plant has a flow rate of 0.029 m3/s. The effluent from the primary tank has a BOD5 of 240 mg/L. Using the following assumptions, estimate the required volume...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l. Assume the following design criteria are applicable: Domestic sewage flow = 100 gal/cap/day (including I/I) BOD loading = 0.18 lbs/cap/day TSS loading = 0.20 lbs/cap/day BOD removal in primary = 33%...
ADVERTISEMENT