Question

Question1 Build up the gross labour rates for the Craftsmen and Labourers using basic rates of...

Question1

Build up the gross labour rates for the Craftsmen and Labourers using basic rates of R5,00 and R2,00 respectively.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Using gross labour rates of R5,00 per hour for craftsmen and R2,00 per hour for labourers,...
Using gross labour rates of R5,00 per hour for craftsmen and R2,00 per hour for labourers, and the prices of materials given below, work up the following rates: 1. Cement mortar (1:4) hand-mixed …per cubic metre. 2. Cement lime mortar (1:2:9), machine-mixed …per cubic metre. 3. (a) Half-brick wall in common bricks in mortar (1:4) …per square metre. (b) Ditto fair-faced and pointed both sides …per square metre. 4. Bituminous felt DPC 115mm wide …per linear metre. 5. Clinker concrete...
question1 You can buy and sell currency at the following exchange rates: ??? 0.047/???,    ??? 17.25/???,   ...
question1 You can buy and sell currency at the following exchange rates: ??? 0.047/???,    ??? 17.25/???,    ??? 0.79/??? a.Is there an arbitrage in these exchange rates? Please provide evidence for your answer. b.If you start out with USD 100,000, what trades would you make to take advantage of any arbitrage you find? How many USD would you end up with?
calculate the equipment and labour prices per m3 to excavate 3000 m3 of trench using 0.75...
calculate the equipment and labour prices per m3 to excavate 3000 m3 of trench using 0.75 m3 backhoe costing $670/day (day = 8 hrs), plus $4000 for transportation and set up charges. Expected output is 60 m3/day with an operator and 0.5 labour at wages of $40 and $30 respectively. Answer:
Create a Just BASIC console application that calculates and displays First And Last Name, Gross Pay,...
Create a Just BASIC console application that calculates and displays First And Last Name, Gross Pay, Taxes Withheld, and Net Pay based on specified user input. In English Using (Just Basic v2.0).
Suppose that Capital (K) and Labour (L) are perfect substitutes. Initially wage (w) rates are equal...
Suppose that Capital (K) and Labour (L) are perfect substitutes. Initially wage (w) rates are equal to the rental rate on K (r), this means that the firm is indifferent between choosing K and L. Suppose now that wage rate goes up. What happens to demand for L? What are the substitution and scale effects?
Hypothetically, the Federal Reserve is dropping rates up two or three times this year, probably at...
Hypothetically, the Federal Reserve is dropping rates up two or three times this year, probably at a quarter point per time. If you were the CFO of a medium-sized firm, how might that affect your decision to expand and build a new manufacturing plant? paragraph answer please?
Actual interest rates for one and four-year bonds are 5.25% and 5.95% respectively. Using expectations theory,...
Actual interest rates for one and four-year bonds are 5.25% and 5.95% respectively. Using expectations theory, what is the expected interest rate for a three-year bond one year from today? Please show the equation you are plugging numbers into as well. I can't figure out how to calculate this without 1R3 or one of the expected rates being given up front. Help!! -----------the answer is not 6.18---------
You have a job with a gross pay of $63,000. Using the website 2018-2019 Federal Tax...
You have a job with a gross pay of $63,000. Using the website 2018-2019 Federal Tax Brackets, answer the following questions: a) What is your tax bracket?   % 22 b) How much of your income is taxed at the following rates: 10% $ 9700 12% $ 39475 22% $ 40000   Both 12% and 22% is wrong what am I doing wrong when coming up with the answer. please show work
Using Percentage-of-Completion and Completed Contract Methods Halsey Building Company signed a contract to build an office...
Using Percentage-of-Completion and Completed Contract Methods Halsey Building Company signed a contract to build an office building for $60,000,000. The scheduled construction costs follow. Year Cost 2016 $12,000,000 2017 18,000,000 2018 10,000,000 Total $40,000,000 The building is completed in 2018. For each year, compute the revenue, expense, and gross profit reported for this construction project using each of the following methods. a. Percentage-of-completion method 2016 2017 2018 Revenue $Answer $Answer $Answer Expense $Answer $Answer $Answer Gross Profit $Answer $Answer $Answer...
Create a dollar roll matrix of breakeven rates for an agency MBS with gross and deal...
Create a dollar roll matrix of breakeven rates for an agency MBS with gross and deal coupons of 8.035% and 7.5%, respectively, and settlement dates 6/14/18 and 8/15/18. Assume standard fully amortizing fixed rate mortgages with a term of 30:0, a WAM of 29:5 and an immediate price of 96-16. MBS CF’s are due the owner of record on the first of each month, but are paid on the 25th of that month. Assume standard PSA benchmarks. The spreadsheet should...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT