Question

What is total station?explain the procedure for LS and CS for a proposed road

What is total station?explain the procedure for LS and CS for a proposed road

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider the proposed matrix factorization: A = LS, where L is lower triangular with 1’s on...
Consider the proposed matrix factorization: A = LS, where L is lower triangular with 1’s on the diagonal, and S is symmetric. (a) Show how the LU decomposition can be used to derive this factorization. (b) What conditions must A satisfy for this factorization to exist?
(a) In order to stabilise a section of a proposed road on a deep soft clay...
(a) In order to stabilise a section of a proposed road on a deep soft clay layer, the vibro replacement technique is used. According to the particle size distribution of the backfill material, the following information is given: D50 = 50 mm, D20 = 10 mm and D10 = 0.5 mm with a trace of fine grained soil (less than 3%). Check is this soil can be used as a backfill material? b) Explain why preloading and prefabricated vertical drains...
a highway curve for a rural two-lane road connects front and back tangents at Station 74+30...
a highway curve for a rural two-lane road connects front and back tangents at Station 74+30 at an angle (delta) of 38 degrees 16’ 31”. using the maximum allowable superelevation for the curve,(a) what would be its minimum radius for design for a posted speed of 55mph? (b) What would be the station locations of the PC and PT for this curve? (c) If the inner radius was kept clear of all visual obstructions out to a distance of 45...
An example of a multivariate procedure is analysis of covariance (ANCOVA). Explain what is meant by...
An example of a multivariate procedure is analysis of covariance (ANCOVA). Explain what is meant by the following statement: ANCOVA offers post hoc statistical control. Provide an example.
An existing undivided 2-lane road with a total traveled way of 22 ft with no shoulders...
An existing undivided 2-lane road with a total traveled way of 22 ft with no shoulders has a capacity of 1100 vph/lane. If the traveled way is increased to 24 ft and a 4 ft shoulder is added on each side of the road, what will be the new lane capacity?
What is signaled avoidance? Explain the typical procedure. How does the two-process theory explain signaled avoidance?...
What is signaled avoidance? Explain the typical procedure. How does the two-process theory explain signaled avoidance? Discuss evidence supporting/challenging the assumptions of the two-process theory of signaled avoidance.
1. What is a proper procedure for using a drying agent? 2. Explain aprotic and protic...
1. What is a proper procedure for using a drying agent? 2. Explain aprotic and protic solvent effect on k for Sn1 and Sn2.
5) A)Interstimulus interval -Define/explain what it is, and what it optimally should be. b)Explain how the...
5) A)Interstimulus interval -Define/explain what it is, and what it optimally should be. b)Explain how the sequence of the CS and UCS matters - if the bell or the meat comes first in classical conditioning. What does the importance of the CS-UCS sequence show? c)An individual’s learning history – explain how that matters in classical conditioning d) Biological preparedness (BP) to learn certain associations, i.e., those that are threatening. Define/ explain what BP is.
The government wishes to construct a bypass road at a particular point in order to ease...
The government wishes to construct a bypass road at a particular point in order to ease congestion around the town. a study is conducted that involves three groups of individuals and the following demand curves are derived. Group1; Q1=20-0.2P1 GROUP2: Q2= 35-0.5P2 GROUP3; Q3=40-0.8P3 Where q is the size of the road and p is the contribution per group. if the total cost of constructing the road is 5 billion Explain why the road may not be constructed if left...
The government wishes to construct a bypass road at a particular point in order to ease...
The government wishes to construct a bypass road at a particular point in order to ease congestion around the town. a study is conducted that involves three groups of individuals and the following demand curves are derived. Group1; Q1=20-0.2P1 GROUP2: Q2= 35-0.5P2 GROUP3; Q3=40-0.8P3 Where q is the size of the road and p is the contribution per group. if the total cost of constructing the road is 5 billion Explain why the road may not be constructed if left...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT