Question

A compaction test measures a maximum dry density of 1666 kg/m3 and an optimum water content...

A compaction test measures a maximum dry density of 1666 kg/m3 and an optimum water content of 18.0%. The soil has an estimated Gs value of 2.68. A contract requires compaction to 95% of maximum dry density at water content of optimum or greater. A field test measures a moist density of 2023 kg/m3 and a water content of 27%.

a)     Use the values given for measured moist density and water content, calculate the field dry density

b)     Does the compacted fill meet the contract requirement?

c)     Compute degree of saturation in the field.

d)     What do the results tell you about the reliability of the field data?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
In a Proctor compaction test, the optimum water content of a fill material is found as...
In a Proctor compaction test, the optimum water content of a fill material is found as 12%. Specific gravity of solids is 2.6, maximum void ratio is 0.93, and minimum void ratio is 0.53. A 2.4m (height) x 30m x 30m embankment of this soil is to be compacted to 90% relative density. a)The embankment will be compacted in 8 layers of 30cm thickness.Calculate the quantity of water to be added to each layer for the most efficient compaction. b)You...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction...
1. Compute the compactive effort or compaction energy for a soil sample compacted in a mold...
1. Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor...
An experimental compaction curve was found to be below the zero-air-void line. At maximum dry density...
An experimental compaction curve was found to be below the zero-air-void line. At maximum dry density on the compaction curve, the degree of saturation of the soil is less than 100%. True False
A New Zealand standard compaction test gave the following results. Assume p = 2.7t/m^3. Calculate the...
A New Zealand standard compaction test gave the following results. Assume p = 2.7t/m^3. Calculate the dry densities to complete the table. Plot the dry density against water content and the 0% air voids. From the graph find the maximum dry density, the optimum water content and the percentage of air voids at MDD What is the water content necessary for complete saturation at MDD. Dry density (kg/L) Water content (%) Dry density (kg/L0 Dry density at 0 % air...
SOIL COMPACTION. For the compaction control of an embankment, maximum dry volumetric weight of 20.06gr/cm3 and...
SOIL COMPACTION. For the compaction control of an embankment, maximum dry volumetric weight of 20.06gr/cm3 and Optimum Moisture Content (OMC) of 10% are specified. The quarry material used for said embankment has a humidity of 5% on site and a volumetric weight of 1.75 gr/cm3. The embankment is built in layers 30 cm thick (considered before compaction). Calculate: a) The amount of water in litres/m2 that must be added on site to the quarry material in order to reach the...
1.       Compute the compactive effort or compaction energy for a soil sample compacted in a mold...
1.       Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. 2.       Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction test?...
10. A test group G1 compacts the soil in the compaction mould in 3 layers, giving...
10. A test group G1 compacts the soil in the compaction mould in 3 layers, giving 25 blows of rammer to each layer. Another test group G2 of your laboratory session uses 5 layers, giving 25 blows of rammer to each layer. Compare the compaction test parameters (maximum dry unit weight and optimum water content) of the two groups?
A field density test on compacted, well-graded sand produced the following information: water content = 5%,...
A field density test on compacted, well-graded sand produced the following information: water content = 5%, total density = 112 pcf. Additional standardized tests were performed for determining the sand's relative density following ASTM D4253 and D4254, and these standardized tests produced a minimum dry density of 89 pcf and a maximum dry density of 115 pcf. The specific gravity of solids is 2.65 for this soil.Compute (a) the field dry density and void ratio, (b) min and max void...