.) In markings for underground utilities after a “Call Before You Dig” locate has been done, yellow paint on the ground would indicate:
16.) Regarding STELs, the relevant time period is on average is typically a ________ minute period.
17.) Based on class lecture, on trenching excavation, the minimum depth that requires trench shoring is ____ feet
18.) Currently, according to class lecture, the best method to check underground utilities for both location and depth is via ____________ methods
Solution is posted below.
Hope it helps.
15:Yellow color marking is for gas oil steam and petroleum etc.
Hence option b is correct.
16:STEL short term exposure limit. As per it 15 minute time period is not exceeded.
Option B .
17:Trench shoring i.e bracing is required for 5 feet or deeper as per osha.
Option c.
18:Though all the methods given can be helped in finding utility location but ground penetration radar can be employed to find depth too.
Hence option a is ths answer.