Question

SR 360 is a four-lane highway without median with 12-ft lanes and 70 mph design speed.In...

SR 360 is a four-lane highway without median with 12-ft lanes and 70 mph design speed.In one section of the highway,a transition must be made between a horizontal curve with radius 1828.2 ft and a tangent section.

a)What is the minimum required length of the spiral transition curve?

b)How long should the transition runoff length be?Assumed rotated through the center line

c)Which one of the two values will you adopt as your transition curve length? Why?

Homework Answers

Answer #1

If you like the answer, please give a thumbs-up.

Thank you !

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A horizontal curve with a 300 intersecting angle on a two-lane highway with 12-ft has a...
A horizontal curve with a 300 intersecting angle on a two-lane highway with 12-ft has a 60 mph design speed. The radius for the horizontal curve has been set to 1,250 ft. The PI is located at station 85 + 29.14 and the normal crown on the tangent is 2%. Determine: a) Tangent to Spiral (TS) station, b) Spiral to Curve (SC) station, c) Curve to Spiral (CS) station, and d) Spiral to Tangent (ST) station.
A horizontal curve with a 300 intersecting angle on a two-lane highway with 12-ft has a...
A horizontal curve with a 300 intersecting angle on a two-lane highway with 12-ft has a 60 mph design speed. The radius for the horizontal curve has been set to 1,250 ft. The PI is located at station 85 + 29.14 and the normal crown on the tangent is 2%. Determine: a) Tangent to Spiral (TS) station, b) Spiral to Curve (SC) station, c) Curve to Spiral (CS) station, and d) Spiral to Tangent (ST) station.
A horizontal curve on a three-lane highway with 12-ft lanes has a PC located at station...
A horizontal curve on a three-lane highway with 12-ft lanes has a PC located at station 10+00 and PT at station 13+70. The central angle is 25 degrees, the superelevation is 4%, and 40 ft of clearance is available between an obstruction and the centerline. Determine the maximum safe design speed to the nearest 5 mph.
A two-lane highway with a design speed of 106.7 km/h requires a transition curve for a...
A two-lane highway with a design speed of 106.7 km/h requires a transition curve for a horizontal curve of 550 m radius. The curve is used to connect the tangents that form an external angle of 24 degree. The lanes of the highway are 3.65 m wide and the coefficient of side friction for this design speed is 0.11. The change of grade between the centreline and the edge (i.e. Δg) is limited to 1 over 250 for comfort. Calculate...
A specification for highway superelevation transition stipulates that the edge profile transition is not to exceed...
A specification for highway superelevation transition stipulates that the edge profile transition is not to exceed a 1:200 difference from the centerline profile. A right-hand curve is being designed with full superelevation of 8% on a four-lane divided freeway. The lanes are 12ft wide, and the design speed is 70 mph. The normal slope is 1% and the superelevation is to be rotated about the median edge of the running lanes. What is most nearly the minimum length of transition...
A horizontal curve of radius 5620 ft is designed for 60 mph. The roadway is a...
A horizontal curve of radius 5620 ft is designed for 60 mph. The roadway is a 4-lane undivided highway with 12-ft lanes. A tree is located on the inside of the curve only 42 ft from the center of the road. Does it pose a stopping sight distance problem for the drivers travelling at the design speed? Show all supporting calculations.
A horizontal curve is being designed for a new four-lane roadway with 11-ft lanes. The PT...
A horizontal curve is being designed for a new four-lane roadway with 11-ft lanes. The PT is located at station 1050+20, the design speed is 45 mph and maximum superelevation of 4%. If the central angle of the curve is 30 degrees, what is the radius of the curve and location of the PC and PI?
ou are asked to design a horizontal curve for a two-lane road. The road has 12-ft...
ou are asked to design a horizontal curve for a two-lane road. The road has 12-ft lanes. Due to expensive excavation, it is determined that a maximum of 35 ft can be cleared from the road’s centerline toward the inside lane to provide for stopping sight distance. Also, local guidelines dictate a maximum superelevation of 0.08 ft/ft. Determine the design speed for this curve (mph)?
1. A horizontal curve on a two-lane highway is designed with a 2000 ft radius, 12...
1. A horizontal curve on a two-lane highway is designed with a 2000 ft radius, 12 ft lanes, and 60mph design speed. Determine the distance that must be cleared from the inside edge of the inside lane to provide a sufficient stopping sight distance. 2, A flexible pavement is constructed with 102 mm (4 inches) of hot mix asphalt (HMA) wearing surface, 203 mm (8 inches) of emulsion/aggregate-bituminous base, and 203 mm (8 inches) of crushed stone subbase. The subgrade...