A biological reactor treats water for a small community in Mthatha. The reactor acts as a...

A biological reactor treats water for a small community in Mthatha. The reactor acts as a perfectly mixed aeration pond. The pond receives an incoming 50 m3 /d of contaminated water with a BOD5 of 345 mg/L. The target discharge BOD5 is 30 mg/L which the treatment plant must achieve before the treated water can be discharged into the environment. The kinetic constants for the system are Ks = 120 mg/L BOD5, kd = 0.10 d-1 , µm = 1.85 d-1 , and Y = 0.75 mg VSS/mg BOD5

i. Draw a diagram of the above scenario annotating all parameters.

ii. Determine the detention time required in the pond to achieve the target discharge BOD5?

iii. Determine the amount of microbes in kg that will be produced in the pond per day?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A rectangular, well-mixed aeration lagoon is 75 m long, 5 m wide, and 2 m deep....
A rectangular, well-mixed aeration lagoon is 75 m long, 5 m wide, and 2 m deep. It receives 400 m3/d of wastewater with a BOD5of 367mg BOD5/L for treatment. The biodegradation rate constants for the wastewater are the following: yield coefficient = 0.8 mg VSS/mg BOD5, endogenous decay constant = 0.08 d-1, maximum specific microbial growth rate = 1 d-1, and half velocity constant = 76.0 mg BOD5/L.                                                                                                               What must the hydraulic detention time be in the aeration pond? (days)...
Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume...
Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume of the aeration basin). Base your design for the first approach on detention time, for the second one on BOD loading, and the third one on kinetics. The influent design flow rate to the activated sludge process is 10,000 m3 /day with a BOD5 concentration of 200mg/L. Completely mixed activated sludge processes typically have a detention time ranging from 3 to 6 hours and...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant (WWTP) to a secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 30 mg/L suspended solids. They have selected a completely mixed activated sludge system for the upgrade. The existing primary treatment plant has a flow rate of 0.029 m3/s. The effluent from the primary tank has a BOD5 of 240 mg/L. Using the following assumptions, estimate the required volume...
Environmental Engineering biological processes, A wastewater with a COD concentration of 970 mg / L 8,000...
Environmental Engineering biological processes, A wastewater with a COD concentration of 970 mg / L 8,000 m3 / day flow, fully mixed back It will be treated in a cyclic activated sludge system.Treatment system mud age will be 5 days will be designed in a way. Kinetic and stoichiometric coefficients were determined as follows. Volumetric organic loading speed: 0,5 kg COD/m3.day uH : 3,7 day-1, bH: 0,04 day-1, KS: 45 mg COD/L, YH: 0,5 g VSS/g COD VSS/TSS: 0,8 mg...