Question

How are cast in place and precast concrete used in airport Construction?

How are cast in place and precast concrete used in airport Construction?

Homework Answers

Answer #1

Precast concrete systems have several applications at airports. Some of these include control towers, parking structures, terminals, ramps, tarmacs, pavements and runways, ancillary structures and more. The main advantage with the precast concrete is it saves lot of time in construction and curing. Moreover as they are constructed in controlled conditions quality conditions a better performance is expected.

Cast in place concrete is used for slabs, flooring, it is also used for substructure construction for example cast in place poles are constructed at the site itself because for non Sandy soils it is not advised to use prexasp piles as they create lot of pore water pressure. Moreover heavy beams, columns , and sort of heavy component of the building is constructed by cast in place concrete

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
How is a cast-in-place concrete structural frame installed? How are bolted connection made during the construction...
How is a cast-in-place concrete structural frame installed? How are bolted connection made during the construction of a steel framed building? What construction methods are used if bedrock is encountered during utility installation? If poor soil is encountered? What construction method are available for the installation of utilities across a busy highway? Who is responsible for the layout of a highway?
Which following types of foundation used with wood light frame construction? concrete masonry foundation wall permanent...
Which following types of foundation used with wood light frame construction? concrete masonry foundation wall permanent wood foundation monolithic slab sitecast concrete foundation wall
A mixing drum at a construction company mixes the highest quality concrete on the east coast....
A mixing drum at a construction company mixes the highest quality concrete on the east coast. This mixing drum is available 18 hours a day. It produces about 10 pounds of concrete a day. As this construction company makes several kinds of concrete a day, they have to stop the machine and change over to a new type of concrete a few times a day. Each pound of concrete takes about 60 minutes to produce. Within this 60 minutes, 50...
As a contractor, you have to cast a dam concrete. Should you use aggregate with round...
As a contractor, you have to cast a dam concrete. Should you use aggregate with round or angular shape? What should be the maximum aggregate size (dmax) 8 mm or 32 mm? Why?
Discuss the characteristics of concrete construction for very tall buildings.
Discuss the characteristics of concrete construction for very tall buildings.
Why is water adjustment necessary in carrying out concrete mix proportioning? How to adjust the water...
Why is water adjustment necessary in carrying out concrete mix proportioning? How to adjust the water content in concrete mix when the aggregate is air-dried?               Which ASTM cement is most appropriate for the following construction applications? What types of mineral and/or chemical admixtures could be used for each application? Give reasons for your choices.                                                                                 Construction of a bridge pier in sea. Construction of concrete pavement (open traffic on the next day). Construction of a transfer plate with a...
CONCRETE What kind of concrete is used for the slab, walls, and columns? What is the...
CONCRETE What kind of concrete is used for the slab, walls, and columns? What is the design strength (in psi)? What is the slump? How does the contractor make sure that there will be no voids at the bottom of the walls? Where does the concrete come from? How is the concrete delivery sequenced and coordinated?
A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual...
A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual O&M costs are $105,000. At the end of the 8-year planning horizon, the mixer will have a salvage value of $5,000. If the mixer is replaced, a new mixer will require an initial investment of $375,000 and at the end of the 8-year planning horizon, the new mixer will have a salvage value of $45,000. Its annual O&M cost will be only $40,000 due...
You are responsible for designing a concrete mixture to be used in the fabrication of a...
You are responsible for designing a concrete mixture to be used in the fabrication of a new multi-story reinforced concrete parking garage on campus. a) Name four mixture ingredients (not water/not aggregates hint: cement type, admixtures, SCMs) you would consider for the optimal concrete mixture design to save the university some money without compromising durability and respecting structural specifications (strength) also, you need to make sure that the mixture is workable enough to be pumped in place. b) President Hargis...
What is the term used for shortening a logic network after construction has begun? Crashing Fast...
What is the term used for shortening a logic network after construction has begun? Crashing Fast tracking Resource leveling Time-scaled network How is free-float defined? The amount of slack between activities The amount of slack within a path of activities The amount of slack accumulated throughout the logic network The amount of slack in a node The path with the longest sequence of activities in a project plan is called: Crises Critical Concrete Detailed        Lead-times are used to determine...