Question

  On which side of the (compaction) curve would a contractor prefer to be, and why?

  On which side of the (compaction) curve would a contractor prefer to be, and why?

Homework Answers

Answer #1

mostly it on dry side.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Would a contractor prefer a cost reimburseable contract or a fixed price contract? Why?
Would a contractor prefer a cost reimburseable contract or a fixed price contract? Why?
Draw Compaction curve
Draw Compaction curve
As a manager, which the patient care delivery system would you prefer?Why?
As a manager, which the patient care delivery system would you prefer?Why?
An experimental compaction curve was found to be below the zero-air-void line. At maximum dry density...
An experimental compaction curve was found to be below the zero-air-void line. At maximum dry density on the compaction curve, the degree of saturation of the soil is less than 100%. True False
Why is soil compaction an important for construction in engineering earthworks?
Why is soil compaction an important for construction in engineering earthworks?
In which type of industry do you think customers would prefer to buy products, and why?...
In which type of industry do you think customers would prefer to buy products, and why? (Choose one below and explain your reasoning.) Option A: In an industry dominated by a Monopoly. Option B: In an industry characterized by Pure Competition.
In dissecting a worm, why would the worm be arranged dorsal side up and why would...
In dissecting a worm, why would the worm be arranged dorsal side up and why would you cut off-center along the dorsal side?
Why would shareholders prefer to shift to riskier projects at the expense of bondholders?
Why would shareholders prefer to shift to riskier projects at the expense of bondholders?
A dispute has arisen between the sub-contractor and concrete supplier with the level of workability reported...
A dispute has arisen between the sub-contractor and concrete supplier with the level of workability reported for a large batch of concrete supplied at a construction site. The supplier has confirmed that the batch supplied at location A has a slump pattern typically representative of zero slump. In contrast, the sub-contractor has confirmed that the batch supplied at location B has a slump pattern typically representative of shear slump. Briefly describe the consistency grades of fresh concrete that apply to...
what is standard proctor compaction test and why is it important (the purpose of the test)...
what is standard proctor compaction test and why is it important (the purpose of the test) please give detailed explanation in your own words. Thank you!
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT