Question

. It is required to dewater a construction site 80 m by 80 m. The bottom...

. It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumping wells (radius of each well is 0.5 m) are to be used and placed at the site four corners. The confined aquifer transmissivity and storage coefficient are 1,600 m2/day and 0.16, respectively. The site needs to be ready for construction after one month of pumping. Determine the required pumping rate to achieve the dewatering required. The points represented by “b” points are critical and govern the pumping rate. Use the Cooper –Jacob approximation. (15 points)

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
It is required to dewater a construction site 80m x 80m. The bottom of the construction...
It is required to dewater a construction site 80m x 80m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5 m diameter wells at the corners of the site. The transmissivity and the storage coefficient of the aquifer are 1600 m2/day and 0.16, respectively. The site needs to be ready after 1 month of pumping. Determine required pumping rate.
It is required to dewater a construction site 80m x 80m at UCF. The bottom of...
It is required to dewater a construction site 80m x 80m at UCF. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5 m diameter wells at the corners of the site. The transmissivity and the storage coefficient of the aquifer are 1600 m2/day and 0.16, respectively. The site needs to be ready after 1 month of pumping. Determine the required pumping rate.
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT