Question

Why is soil compaction an important for construction in engineering earthworks?

Why is soil compaction an important for construction in engineering earthworks?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
a. Equipment play important role in construction project. Appraise five equipment uses for compaction in civil...
a. Equipment play important role in construction project. Appraise five equipment uses for compaction in civil engineering field. (EV5 Marks) b. As a student you are given a project to manage. Explain Factors Influencing compaction on soil properties (AN6 Marks) c. Moisture content is one of the lubricant use in compaction of road soil works. Formulate Moisture content test (CR7 marks)
** GEOTECHNICAL ENGINEERING ** Define relative compaction. How is it selected for an earthwork construction? How...
** GEOTECHNICAL ENGINEERING ** Define relative compaction. How is it selected for an earthwork construction? How we can check the field density after compaction? How is the range of water content determined for the field compaction?
Determine the ratio of the compactive energy used in the heavy compaction test to that in...
Determine the ratio of the compactive energy used in the heavy compaction test to that in light compaction test. ( soil mechanics and foundation engineering)
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with...
Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction...
1.       Compute the compactive effort or compaction energy for a soil sample compacted in a mold...
1.       Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. 2.       Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor compaction test?...
what is standard proctor compaction test and why is it important (the purpose of the test)...
what is standard proctor compaction test and why is it important (the purpose of the test) please give detailed explanation in your own words. Thank you!
1. Compute the compactive effort or compaction energy for a soil sample compacted in a mold...
1. Compute the compactive effort or compaction energy for a soil sample compacted in a mold with a volume of 1/30 cubic foot which uses 4 layers to place soil in the mold and compacts each layer using a hammer with a weight of 10 lbs that is dropped 12 inches and uses 20 blows per layer. (2 pts) 2. Using the result from question 1 compare the compaction energy to the Modified Proctor compaction test and the Standard Proctor...
SOIL COMPACTION. For the compaction control of an embankment, maximum dry volumetric weight of 20.06gr/cm3 and...
SOIL COMPACTION. For the compaction control of an embankment, maximum dry volumetric weight of 20.06gr/cm3 and Optimum Moisture Content (OMC) of 10% are specified. The quarry material used for said embankment has a humidity of 5% on site and a volumetric weight of 1.75 gr/cm3. The embankment is built in layers 30 cm thick (considered before compaction). Calculate: a) The amount of water in litres/m2 that must be added on site to the quarry material in order to reach the...
10. A test group G1 compacts the soil in the compaction mould in 3 layers, giving...
10. A test group G1 compacts the soil in the compaction mould in 3 layers, giving 25 blows of rammer to each layer. Another test group G2 of your laboratory session uses 5 layers, giving 25 blows of rammer to each layer. Compare the compaction test parameters (maximum dry unit weight and optimum water content) of the two groups?
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT