Question

You have been retained to design a wastewater treatment plant using a conventional activated sludge process...


You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l.

Assume the following design criteria are applicable:

  • Domestic sewage flow = 100 gal/cap/day (including I/I)

  • BOD loading = 0.18 lbs/cap/day

  • TSS loading = 0.20 lbs/cap/day

  • BOD removal in primary = 33% at surface overflow rate of 1,000 gpd/ft2

  • BOD loading to aeration basin = 40 lb BOD/1000 ft3

  • Oxygen required for aeration = 1.1 1bs O2/lb BOD applied.

  • Aerator oxygen transfer rate = 2.5 lbs O2/hp-hr

  • MLSS concentration = 2,750 mg/l; MLVSS conc.= 0.8 MLSS conc.

  • Final clarifier surface overflow rate = 800 gpd/ft2

Question:

  1. Determine the BOD loading to the aeration basin.

  2. Determine the size of the aeration basin (length/width/height) for a 6-hour detention time.

  3. Calculate the F/M ratio.

  4. Determine aeration requirements (number and hp capacity of aerators)

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A conventional activated sludge plant treating a domestic flow of 150 ML/d is operated at a...
A conventional activated sludge plant treating a domestic flow of 150 ML/d is operated at a SRT of 10 d with a MLVSS of 3500 ppm. The activated sludge plant is required to reduce the influent BOD from 200 ppm to less than 10 ppm prior to discharge. The discharge from the aeration basin is clarified, such that the clarifier overflow contains no particulate material and the MLVSS of the recycle stream is 8000 ppm. You are required to determine...
ANSWER as much as possible: Design an activated sludge process consisting of a complete mix flow...
ANSWER as much as possible: Design an activated sludge process consisting of a complete mix flow through aeration tank followed by final settling tanks. The sizing of the reactor and all appurtenances should be based on a solids retention time, (SRT), of 4 days and the particulates given below. Biological characteristics: Ks = 20 mg/L COD, kd = 0.1 per day, mumax = 3 gVSS/gVSS-day,    Y = 0.4 gVSS/gCOD Primary settling Tank Effluent Characteristics: Q= 20MGD, biodegradable COD, bCOD...
A completely mixed activated sludge process is designed to treat 20,000 m3 /d of domestic wastewater...
A completely mixed activated sludge process is designed to treat 20,000 m3 /d of domestic wastewater having a BOD5 concentration of 250 mg/L following primary treatment. The NPDES permit requirement for effluent BOD5 and TSS is 20 mg/L for each. The biokinetic parameters have been established as: yield = 0.6 , k = 5/d, Ks = 60 mg/L, and kd = 0.06/d. The MLVSS concentration in the aeration tank is to be maintained at 3000 mg/L and the ratio of...
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using...
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using the kinetics equations. The influent BOD of 120 mg/Lis essentially all soluble and the design effluent soluble BOD is 7 mg/L, which is based on a total effluent BOD of 20 mg/L. For sizing the aeration tank, the mean cell residence time is selected to be10 days and the MLVSS 2000 mg/L. The kinetic constants from a bench-scale treatability study are as follows: Y...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by an activated sludge process composed of aeration tanks and a secondary clarifiers. This problem focuses on the activated sludge process. The activated sludge process receives a flow of 15 million gallons per day (MGD). The primary sedimentation process effluent has a BOD5 concentration of 180 mgBOD5/L (this concentration is often referred as S). Before flowing into the activated sludge process, the primary...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a community of 45,000 people has a flow of 100 gal/person/day and a BOD5 loading of 0.2 lb/person/day. The upstream characteristics of the receiving waters are: stream flow rate = 20 cfs and BOD5 = 2 mg/L The water quality standards require the in-stream BOD5 to be less than 7 mg/L in this stretch of the river. The minimum BOD removal efficiency that the treatment...
A wastewater plant with the activated sludge process received 5 × 106 L/day of wastewater with...
A wastewater plant with the activated sludge process received 5 × 106 L/day of wastewater with a BOD5 of 500 mg/L. The primary clarifier removes 30% of the BOD and primary clarify effluent has no biomass (Xi=0 mg/L). Recycle (Qr) and waste sludge (Qw) flows are 25% and 2% of Qin, respectively. Effluent BOD5 from secondary clarifier and waste sludge is 20 mg/L. Microorganism concentration in the waste sludge (Xw) is 6,000 mg/L. Soluble BOD5 is biologically converted into CO2...
Sooner City Reclamation Plant is a completely mixed activated sludge process designed to treat 20,000 m3/d...
Sooner City Reclamation Plant is a completely mixed activated sludge process designed to treat 20,000 m3/d of domestic wastewater having an influent BOD5 concentration of 350 mg/L (assume a 28.6% reduction in during primary treatment). Use typical activated sludge kinetic constants except for kd = 0.06 1/d. Assume that the MLVSS concentration in the aeration basin is maintained at 3,000 mg/L and the ratio of VSS:TSS is 0.75. Permit requires that the effluent BOD5 and TSS concentrations do not exceed...
Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume...
Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume of the aeration basin). Base your design for the first approach on detention time, for the second one on BOD loading, and the third one on kinetics. The influent design flow rate to the activated sludge process is 10,000 m3 /day with a BOD5 concentration of 200mg/L. Completely mixed activated sludge processes typically have a detention time ranging from 3 to 6 hours and...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT