- The desired pipe run length between structures is 150 feet and shall not exceed 300 feet for pipes less than 48 inches in diameter and 500 feet for pipes greater than 48 inches in diameter.

- No, the cost of backfills are not more than the Excavation because backfilling is the process of putting the soil back into a trench or foundation once excavation, and the related work has been completed.

So it is relatively easy, less costly and fast process from Excavation.

● The cost of excavations ranges from $50 to $200 per cubic yard and the cost per cubic yard of backfill ranged from $6.40 to $7.50.

So according to this the cost of backfill is approximaetly 5-6 % of cost of excavation.

thank you.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions