-What is recommended working/forming distance for storm drain catch basin 24" x 24"?
-Are backfill costs higher than the excavation costs? , and what is percentage for the difference in costs?
- The desired pipe run length between structures is 150 feet and shall not exceed 300 feet for pipes less than 48 inches in diameter and 500 feet for pipes greater than 48 inches in diameter.
- No, the cost of backfills are not more than the Excavation because backfilling is the process of putting the soil back into a trench or foundation once excavation, and the related work has been completed.
So it is relatively easy, less costly and fast process from Excavation.
● The cost of excavations ranges from $50 to $200 per cubic yard and the cost per cubic yard of backfill ranged from $6.40 to $7.50.
So according to this the cost of backfill is approximaetly 5-6 % of cost of excavation.