Question

explain the gauging requirements of the track including the interface with OLE and/or DC conductor in...

explain the gauging requirements of the track including the interface with OLE and/or DC conductor in terms of rail geometry.

Homework Answers

Answer #1

● The rail gauge for track is defined as the clear minimum perpendicular distance between the inner faces of the two rails.

Broad Gauge: width 1676 mm to 1524 mm or 5'6” to 5'0”

Standard Gauge: width 1435 mm and 1451 mm or 4'-8⅟2”

● OLE (Overhead line equipment):- The of position the overhead contact wire, which supplies electric power to the train, in terms of height above rail level and horizontal distance from the centre line of track is measured on the basis of the rail gauge distance.

Keeping the wire within its design parameters ensures that current collection is optimised and wear of pantograph carbon and contact wire is minimised.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
explain the interface between plain line track and the off-track environment including leaf fall and vegetation...
explain the interface between plain line track and the off-track environment including leaf fall and vegetation management and the interface with signal sighting and OLE equipment.
Assessment 1.0: OLE Planning Process Produce a report detailing the planning process for an OLE construction...
Assessment 1.0: OLE Planning Process Produce a report detailing the planning process for an OLE construction activity (min 600 words), using a recent work as the basis for the report. The report should detail the following: • Strategic planning process for engineering possessions • Planning of engineer’s trains and on track plant • Ordering and supply of materials • Manpower requirements • Road rail machines requirements • Possession arrangements • On track plant detailed plans • Interface with other engineering...
produce a report detailing the planning process for an OLE construction activity using a recent work...
produce a report detailing the planning process for an OLE construction activity using a recent work as the basis for the report. the report should detail the following; • strategic planning process for engineering possessions • planning of engineers trains and on track plant •ordering and supply of materials •manpower requirements •road rail machines requirements •possession arrangements •on track plant detailed plans •interface with other engineering functions •isolation of traction supply •bill of quantities for activity •manufacturer, order and delivery...
Assessment 8.0: Drainage Produce a drawing to explain the drainage requirements for a section of plain...
Assessment 8.0: Drainage Produce a drawing to explain the drainage requirements for a section of plain line track. Identify the gradients and the installation of drainage. Describe 3 types of drains used in common practice within the UK rail industry? 2. Explain how water drains from the track bed, and the effect of ballast on track drainage, and identify the contribution that inappropriate or contaminated ballast has on the drainage of the track bed, and the creation of wet beds?...
Wal-Mart Online Wal-Mart is one of the largest companies in America. It is definitely the largest...
Wal-Mart Online Wal-Mart is one of the largest companies in America. It is definitely the largest retailer, both in terms of the number of stores (8,970 worldwide in 2011) and the level of sales ($419 billion from the 2011 Annual Report). By pushing suppliers to continually reduce costs, Wal-Mart is known for pursuing low prices and the stores often attract customers solely in-terested in lower prices. With Wal-Mart’s expansion into groceries, the company has be-come the largest retail grocer in...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT