Question

what is the diameter of a concrete storm sewer for design flow Q= 30 cfs from...

what is the diameter of a concrete storm sewer for design flow Q= 30 cfs from manhole station 16+00 (inv 150.5ft) to station 14+00(inv 150.50ft)

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A concrete drain pipe is designed on a slope of 0.5% to convey 140 cfs of...
A concrete drain pipe is designed on a slope of 0.5% to convey 140 cfs of peak storm runoff. Assume the following pipe diameters are commercially available: 12-in, 15-in, 18-in, 21-in, 24-in, 27-in, 30-in, 36-in, 42-in, 48-in, 54-in, 60-in, 66-in and 72-in a) State design assumptions b) Specify diameter of pipe c) Show that velocity in pipe is acceptable
Water us draining to a storm sewer from a watershed in east El Paso. The time...
Water us draining to a storm sewer from a watershed in east El Paso. The time of concentration for sheet flow is 20 minutes and shallow flow is another 20 minutes. What is the intensity in cm/hour that you should use for design purposes if you need to design for a 25yr, 24 hour duration storm? (Hint: Use the EP DDM) A) 2.18 B) 5.3 C) 1.6 D) 2
A circular storm water sewer 1.5 m in diameter and effective roughness size 0.6 mm is...
A circular storm water sewer 1.5 m in diameter and effective roughness size 0.6 mm is laid to a slope of 1:500. Determine the maximum discharge which the sewer will convey under uniform open channel conditions. If a steady inflow from surface runoff exceeds the maximum open channel capacity by 20%, show that the sewer will become pressurised (surcharged) and calculate the hydraulic gradient necessary to convey the new flow.
A circular storm water sewer 1.5 m in diameter and effective roughness size 0.6 mm is...
A circular storm water sewer 1.5 m in diameter and effective roughness size 0.6 mm is laid to a slope of 1:500. Determine the maximum discharge which the sewer will convey under uniform open channel conditions. If a steady inflow from the surface runoff exceeds the maximum open channel capacity by 20%, show that the sewer will become pressurized and calculate the hydraulic gradient necessary to convey the new flow. (ans. 3.6 m3/s and 0.00324) without using the mannings formula...
Design a concrete-lined canal to carry a discharge of 10,000 cfs. The canal has a Manning’s...
Design a concrete-lined canal to carry a discharge of 10,000 cfs. The canal has a Manning’s n = 0.015 and is to be laid on a longitudinal slope of 0.0007. If the canal is designed to have a trapezoidal cross section with a side slope of Z = 1.5 and a bottom width/normal depth ratio of b/yn = 3.0, determine its required bottom width, depth, and free board. What is the Froude number (Fr)? Will the canal have a supercritical...
   16.   Which is the first step in a storm sewer design investigation? a. project meeting b. topographic...
   16.   Which is the first step in a storm sewer design investigation? a. project meeting b. topographic map c. site reconnaissance d. local land development ordinance 9. Generally, rainfall is lost in what two processes? a. initial losses and infiltration c. absorption and initial losses b. overland flow and infiltration d. overland flow and absorption 5. Which type of flow occurs when headwater depth rises above the inlet crown, tailwater depth is relatively low, and the culvert barrel is relatively short.  Explain...
After a 2 hour storm, a station downstream from a 45 mi2 drainage watershed records a...
After a 2 hour storm, a station downstream from a 45 mi2 drainage watershed records a peak discharge of 9400 cfs and a total runoff of 3300 acre-ft. (a) what is the unit hydrograph peak discharge? (b) what would be the peak runoff and design flood volume if a 2 hour storm dropped 2.5 inch net precipitation?
what is the flow capacity of a 48 in diameter circular concrete culvert with HW/D =...
what is the flow capacity of a 48 in diameter circular concrete culvert with HW/D = 0.9
A rectangular concrete channel with n=0.013 is to be constructed on 0.5% slope: 1. Design for...
A rectangular concrete channel with n=0.013 is to be constructed on 0.5% slope: 1. Design for a flow rate of Q=18 m^3/s. 2. A 30 cm high, 5 m long broad crested weir is placed in the channel. Calculate the depth upstream y1 and downstream y2 from the weir then get the head loss due to the hydraulic jump
What is the expected after-tax cash flow from selling a piece of equipment if Litchfield Design...
What is the expected after-tax cash flow from selling a piece of equipment if Litchfield Design purchases the equipment today for 50,000 dollars, the tax rate is 20 percent, the equipment is sold in 3 years for 9,000 dollars, and MACRS depreciation is used where the depreciation rates in years 1, 2, 3, 4, and 5 are 30 percent, 25 percent, 21 percent, 14 percent, and 10 percent, respectively? What is the expected after-tax cash flow from selling a piece...