Question

A new road need to be constructed to connect Jalan Ampang and Jalan Tun Razak. After...

A new road need to be constructed to connect Jalan Ampang and Jalan Tun Razak. After a
thorough study by an engineer, it is found that, the equal tangent vertical curve has to be
designed with initial grade of 3% and final grade of 1%. Due to an intersection with an existing
roadway, this new roadway at station 350+650 must be at an elevation of 164 m in order to
provide sufficient headroom for heavy vehicles. Given station PVI is at 350+250 and its
elevation is 160 m. Identify the stations of the curve by setting them out every 200 m.

Homework Answers

Answer #1

please give rating if you like my answer.

Thank you soo much in advance!!!

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT