Question

The ____ root and horns receive____ signals, while the ____ root and horns project ____ signals

The ____ root and horns receive____ signals, while the ____ root and horns project ____ signals

Homework Answers

Answer #1

ANSWERS

The POSTERIOR/DORSAL root and horn recieves SENSORY signals, while the ANTERIOR /VENTRAL root and horns project MOTOR signals.

Spinal nerves are mixedn nerves that send motor, sensory, and autonomic signals between the CNS and the body.They are part of peripheral nervous system. Each spinal nerve is formed by the combination of nerve fibers from the dorsal (posterior) and ventral (anterior)roots of the spinal cord.

The posterior root is the sensory (afferent) root that recieves sensory informations from other areas of the body to brain . The anterior root is the motor (efferent) root that carries motor information to the body from the brain.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The sensory neuron cell bodies are located in the ________ . A. dorsal (posterior) root (spinal)...
The sensory neuron cell bodies are located in the ________ . A. dorsal (posterior) root (spinal) ganglia B. ventral (anterior) gray horns C. lateral gray horns D. dorsal (posterior) gray horns E. gray commissures
Design a filter circuit to remove the noise signals while selectively amplifying the high-frequency signals by...
Design a filter circuit to remove the noise signals while selectively amplifying the high-frequency signals by at least a factor of 100. The low-frequency noise signal has its peak energy in the vicinity of 20 Hz, and has fallen to less than 1 % of its maximum by 1 kHz. The engine failure signals begin in the vicinity of 25 kHz.
2. What Root causes lead to the need for a major infrastructure replacement project? from An...
2. What Root causes lead to the need for a major infrastructure replacement project? from An adventure of an IT leader ...Austin textbook chap 6
“Create a new Java Project” Project name = Lab3 “Use project folder as root for sources...
“Create a new Java Project” Project name = Lab3 “Use project folder as root for sources and class files” Finish Set your classpath for the workspace: Project > Properties > Java Build Path Libraries Add External Jars # if on Windows Choose algs4.jar and stdlib.jar from your user directory Documents/alg4 # else Choose algs4.jar and stdlib.jar from ~/alg4 (I hope you’re getting familiar with this sequence. From now on, I’ll just say “create new project LabX”, and you’ll need to...
the train is moving past a crossing where cars are waiting for it to pass. while...
the train is moving past a crossing where cars are waiting for it to pass. while waiting, the driver of the lead car becomes sleepy and rests his head on the steering wheel, unintentionally activating the cars horn. a passenger in the back of the train hears the horns sound at a frequency of 434 Hz and a passenger in the front hears it at 409 Hz. find the trains speed and the horns frequency, assuming the sound travels along...
The Also Horns Corp. is planning on introducing a new line of saxophones. They expect sales...
The Also Horns Corp. is planning on introducing a new line of saxophones. They expect sales to be $400,000 with total fixed and variable costs representing 70% of sales. The discounted rate of the unlevered equity is 17%, but the firm plans to raise $144,385 of the initial $450,000 investment as 9% perpetual debt. The corporate tax rate is 40% and the target debt to asset (or value) ratio is 0.3. In addition to the information above, suppose the APV...
A person always use a sample size between cube root N and square root N, where...
A person always use a sample size between cube root N and square root N, where N is the size of the population that he/she investigates. In which situations, he/she should use a correction factor for the variance of the sampling distribution while estimating a confidence interval for mean of population? What occurs when she does not use this correction factor, which problems may occur?
1. Project Q offers a pre-tax return of 7% while project Z has a pre-tax rate...
1. Project Q offers a pre-tax return of 7% while project Z has a pre-tax rate of return of 11%. At the same time, income streams from Project Q are tax exempt while income from Project Z is taxable at an ordinary tax rate of 24%. (Assume the tax year is 2020). a. What is the after-tax rate of return for Project Q? What is the after-tax rate of return for Z?        b. Ignoring your answer to part a.,...
QUESTION 76 For the next 8 questions suppose the following data. The Also Horns Corp. is...
QUESTION 76 For the next 8 questions suppose the following data. The Also Horns Corp. is planning on introducing a new line of saxophones. They expect sales to be $400,000 with total fixed and variable costs representing 70% of sales. The discounted rate of the unlevered equity is 17%, but the firm plans to raise $144,385 of the initial $450,000 investment as 9% perpetual debt. The corporate tax rate is 40% and the target debt to asset (or value) ratio...
11. While valuing a levered investment project the approach that would lead to the highest value...
11. While valuing a levered investment project the approach that would lead to the highest value would be: A. APV B. Flow to Equity C. Regardless of the approach selected, the value of a levered project should be the same
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT