Question

128. Myofibrils are constructed of overlapping strands of protein polymers known as which of the following?...

128. Myofibrils are constructed of overlapping strands of protein polymers known as which of the following?
Actin and tropomyosin
Tropin and myosin
Tropoactin and myosin
Actin and myosin

146. In an endurance mesocycle of a beginner's program, which rep and set scheme would be most appropriate?
12-15 reps, 3 sets
4-6 reps, 1 set
8-10 reps, 4 sets
2-5 reps, 5 sets

150. Which of the following increases the rate of fatty acid metabolism and decreases the rate of carbohydrate metabolism during aerobic exercise?
Fish oil
Caffeine
Alcohol
Magnesium

151.Which of the following body types will have an inflated BMI?
Extremely thin
Extremely muscular
Ectomorph
Mesomorph

152. Client differences are an important part of periodization and refer to which principle?
SAID
GAS
Use/disuse
Individual differences

161. During training, clients with hypertension should avoid which of the following?
Seated resistance exercises
Squat jumps
Rising slowly from seated exercises
Flexibility training

163. The Law of Overcompensation and Overload allows for which of the following in regards to intensity?
Progressively increase over a period to time
Progressively decrease over a period of time
Remain the same
Acute decrease over a period of time

168. Which contraction helps to generate enough tension in muscles to contract explosively?
Eccentric
Ballistic
Concentric
Isometric




Homework Answers

Answer #1

128) answer : actin and myosin

Myofibrils are constructed of overlapping strands of protein polymers known as actin and myosin , because myofibril constitute actin and myosin

146) answer :4-6 reps , 1 set

In an endurance mesocycle of a beginner's program 4-6 reps , 1 set is recommended

150) answer : fish oil

Fish oil increases metabolism of fatty acids and decreases the metabolism of the carbohydrates during the aerobic exercise . As fish oil contains omega 3 fatty acids , it helps to switch the carbohydrates to fats thus decreases carbohydrates metabolism and increases fatty acid metabolism

151) answer : extremely muscular

Extremely muscular body will have inflated BMI because they gain weight faster and have extreme weight compared rp other bodies

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
1. Tendons and ligaments are similar because they both have: a limited blood supply and low...
1. Tendons and ligaments are similar because they both have: a limited blood supply and low metabolism an abundant blood supply and low metabolism a limited blood supply and high metabolism an abundant blood supply and high metabolism 2. What is the name of the outer layer of connective tissue on skeletal muscle? perimysium epimysium endomysium intermediate fascia 3. The functional units of skeletal muscle that allow it shorten are: tendons fascicles sarcomeres perimysium 4. In terms of muscle actions...
52. BMR stands for basic memory retention basal metabolic rate bregmatic myofascial release none of these...
52. BMR stands for basic memory retention basal metabolic rate bregmatic myofascial release none of these 53. The primary (not initial) fuel during endurance exercise is liver glycogen muscle glycogen fatty acids none of these 54. The human body consists of chemicals cells tissues none of these all of these 55. The main purpose of the digestive system is the breakdown of foods and waste elimination to supply oxygen and eliminate carbon dioxide reproduction and maintenance of sexual characteristics none...
Which of the following best describes a project management plan? The project charter, WBS, and project...
Which of the following best describes a project management plan? The project charter, WBS, and project scope statement The schedule, management plans, and budget A formal, approved document used to control the project The project manager's plan for managing and controlling the work The engineering department wants the project objective to be a 10 percent improvement in throughput. The information technology department wants no more than 5 percent of its resources to be used on the project. Management, who is...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT