Question

A farmer plans to plant two crops, A and B. The cost of cultivating Crop A...

A farmer plans to plant two crops, A and B. The cost of cultivating Crop A is $40/acre whereas the cost of cultivating Crop B is $60/acre. The farmer has a maximum of $7400 available for land cultivation. Each acre of Crop A requires 20 labor-hours, and each acre of Crop B requires 25 labor-hours. The farmer has a maximum of 3300 labor-hours available. If she expects to make a profit of $160/acre on Crop A and $180/acre on Crop B, how many acres of each crop, x and y, respectively, should she plant in order to maximize her profit?

(x, y) =

What is the optimal profit?
$

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A farmer plans to plant two crops, A and B.  The cost of cultivating crop A is...
A farmer plans to plant two crops, A and B.  The cost of cultivating crop A is $40/acre, whereas the cost of cultivating crop B is $60/acre.  The farmer has a maximum of $7400 available for land cultivation.  Each acre of crop A requires 20 labor-hours and each acre of crop B requires 25 labor-hours.  The farmer has a maximum of 3300 labor-hours available. If she expects to make a profit of $150/acre on crop A and $200/acre on crop B, how many acres...
The Johnson Farm has 500 acres of land allotted for cultivating corn and wheat. The cost...
The Johnson Farm has 500 acres of land allotted for cultivating corn and wheat. The cost of cultivating corn and wheat (including seeds and labor) is $44 and $32 per acre, respectively. Jacob Johnson has $20,200 available for cultivating these crops. If he wishes to use all the allotted land and his entire budget for cultivating these two crops, how many acres of each crop should he plant? (Let x and y denote the number of acres of corn and...
A farmer has a 40-acre farm in Georgia. The farmer is trying to determine how many...
A farmer has a 40-acre farm in Georgia. The farmer is trying to determine how many acres of corn, peanuts, and cotton to plant. Each crop requires labor, fertilizer, and insecticide. The farmer has developed the following linear programming model to determine the number of acres of corn (x1), peanuts (x2), and cotton (x3) to plant in order to maximize profit. Max400(X1) + 350(X2) + 450(X3) s.t. Constraint 1: 2(x1) + 3(X2) + 2(X3) 120labor hours Constraint 2: 4(x1) +...
A farmer is creating a whole farm plan for the upcoming production year. He has 800...
A farmer is creating a whole farm plan for the upcoming production year. He has 800 acres of land available for crop production. He wants to maximize his gross margin of two crops, soybeans and corn. He believes that he can obtain a gross margin of $80 per acre of soybeans and $100 per acre of corn. He has 3500 available labor hours to allocate between the two crops and has determined that soybeans will require 2.5 hours of labor...
Problem 1-1: A farmer owns 450 acres of land. He is going to plant each acre...
Problem 1-1: A farmer owns 450 acres of land. He is going to plant each acre with wheat or corn. Each acre planted with wheat yields $4000 profit, requires three workers, and requires two tons of fertilizer. Each acre planted with corn yields $2000 profit, requires two workers, and requires four tons of fertilizer. There are currently 1000 workers and 1200 tons of fertilizer available. To hedge against risk, the farmer wants to sure that the acres of wheat do...
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40...
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40 board feet of wood and 3 labor-hours. Each chair requires 16 board feet of wood and 4 labor-hours. The profit for each table is $40, and the profit for each chair is $30. In a certain week, the company has 3200 board feet of wood available and 520 labor-hours available. How many tables and chairs should Winston manufacture to maximize its profit? (Let x...
The seasonal yield of olives in a Piraeus, Greece, vineyard is greatly influenced by a process...
The seasonal yield of olives in a Piraeus, Greece, vineyard is greatly influenced by a process of branch pruning. If olive trees are pruned every two weeks, output is increased. The pruning process, however, requires considerably more labor than permitting the olives to grow on their own and results in a smaller size olive. It also permits olive trees to be spaced closer together. The yield of 1 barrel of olives by pruning requires 5 hours of labor and 1...
CyclePath Company produces two different products that have the following price and cost characteristics: Bicycle Tricycle...
CyclePath Company produces two different products that have the following price and cost characteristics: Bicycle Tricycle Selling price per unit 100 400 Variable cost per unit 40 240 Management believes that pushing sales of the Bicycle product would maximize company profits because of the high contribution margin per unit for this product. However, only 50,000 labor hours are available each year, and the Bicycle product requires 4 labor hours per unit while the Tricycle model requires 2 labor hours per...
Kane Manufacturing has a division that produces two models of fireplace grates, x units of model...
Kane Manufacturing has a division that produces two models of fireplace grates, x units of model A and y units of model B. To produce each model A grate requires 3 lb of cast iron and 6 min of labor. To produce each model B grate requires 4 lb of cast iron and 3 min of labor. The profit for each model A grate is $1.50, and the profit for each model B grate is $4.00. Also, 1000 lb of...
A farmer can buy two types of plant food, mix A and mix B. Each cubic...
A farmer can buy two types of plant food, mix A and mix B. Each cubic yard of mix A contains 20 pounds of acid, 30 pounds of nitrogen, and 5 pounds of potash. Each cubic yard of Mix B contains 10 pounds of acid, 30 pounds of nitrogen, and 10 pounds of potash. The minimum monthly requirement are 480 pounds of acid, 970 pounds of nitrogen, and 250 pounds of potash. If x is the number of cubic yards...