Question

For the following maximization problems, choose your variables, write the objective function and the constraints, graph...

For the following maximization problems, choose your variables, write the objective function and the constraints, graph the constraints, shade the feasibility region, label all critical points, and determine the solution that optimizes the objective function.

A factory manufactures chairs and tables, each requiring the use of three operations: Cutting, Assembly, and Finishing. The first operation can be used at most 40 hours; the second at most 42 hours; and the third at most 25 hours. A chair requires 1 hour of cutting, 2 hours of assembly, and 1 hour of finishing; a table needs 2 hours of cutting, 1 hour of assembly, and 1 hour of finishing. If the profit is $20 per unit for a chair and $30 for a table, how many units of each should be manufactured to maximize revenue?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
For each of the following minimization problems, choose your variables, write the objective function and the...
For each of the following minimization problems, choose your variables, write the objective function and the constraints, graph the constraints, shade the feasibility region, label all critical points, and determine the solution that optimizes the objective function. 1) A diet is to contain at least 2400 units of vitamins, 1800 units of minerals, and 1200 calories. Two foods, Food A and Food B are to be purchased. Each unit of Food A provides 50 units of vitamins, 30 units of...
4) A furniture manufacturing company manufactures tables and chairs. The relevant manufacturing data are given in...
4) A furniture manufacturing company manufactures tables and chairs. The relevant manufacturing data are given in the table below. How many tables and chairs should be manufactured each day to maximize profit? (12 POINTS) Note: Please clearly define your variables and indicate the objective function and the constraints. Indicate the scale of your axes, and write your final answer using a complete sentence with correct units. Department Table Labor-Hours per Unit Chair Labor-Hours per Unit Maximum Labor-Hours Available per Day...
Part 3 – Steelcase Production Steelcase Corporation manufactures 3 basic products: chairs, desks, and tables. Below...
Part 3 – Steelcase Production Steelcase Corporation manufactures 3 basic products: chairs, desks, and tables. Below is chart which summarizes the number of labor hours spent for each product in each division. Chairs Desks Tables Process Carpentry 2 3 6 Finishing 1 1 1 Assembly 4 6 2 In a given week, Steelcase has 250 hours available for carpentry, 100 hours available for finishing, and 400 hours available for assembly. Steelcase makes a profit of $66 on each chair, $75...
Suppose that a furniture manufacturer makes​ chairs, sofas, and tables. Consider the following chart of labor...
Suppose that a furniture manufacturer makes​ chairs, sofas, and tables. Consider the following chart of labor hours required and available. Chair Sofa Table Daily labor available​ (labor- hours) Carpentry 6 3 8 720 Finishing 1 1 2 144 Upholstery 4 6 0 320 The profit per chair is ​$70​, per sofa ​$50​, and per table ​$100. How many pieces of each type of furniture should be manufactured each day to maximize the​ profit?
LP Graphical Method Problems 1) MAXIMIZATION PROBLEM - 4 PTS Objective Function: Maximize Profit: 5X +...
LP Graphical Method Problems 1) MAXIMIZATION PROBLEM - 4 PTS Objective Function: Maximize Profit: 5X + 3Y Subject to the constraints: 5 X + 2 Y ≤ 40 3 X + 6 Y ≤ 48 X ≤ 7 2 X − Y ≥ 3 X , Y ≥ 0 ******* 2) MINIMIZATION PROBLEM - 4 PTS Objective function: Minimize Cost: 3X + 7Y Subject to the constraints: 9 X + 3 Y ≥ 36 4 X + 5 Y ≥...
10) Natural Furniture Company manufactures three outdoor products, chairs, benches, and tables. Each product must pass...
10) Natural Furniture Company manufactures three outdoor products, chairs, benches, and tables. Each product must pass through the following departments before it is shipped: sawing, sanding, assembly, and painting. The time requirements (in hours) are summarized in the tables below. The production time available in each department each week and the minimum weekly production requirement to fulfill contracts are as follows: Minimum Capacity Production Department (In Hours) Product Level Sawing 450 Chairs 100 Sanding 400 Benches 50 Assembly 625 Tables...
Chairvana’s Table Assembly Operations: Chairvana Inc. manufactures metal tables and chairs at its plant in Paxton,...
Chairvana’s Table Assembly Operations: Chairvana Inc. manufactures metal tables and chairs at its plant in Paxton, Illinois. Recently hired general manager, Bob Behar, is concerned about the large inventories and manufacturing inefficiencies in the plant. The Paxton plant has two separate assembly lines – one for chairs and one for tables. Demand for chairs is significantly larger than tables, so Bob decides to tackle the table assembly process for first. Bob has recently hired a summer intern, Eileen Mayer, who...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of Product 1 to be produced           P2 = number of Product 2 to be produced           P3 = number of Product 3 to be produced Maximize 100P1 + 120P2 + 90P3         Total profit Subject to         8P1 + 12P2 + 10P3 ≤ 7280       Production budget constraint             4P1 + 3P2 + 2P3 ≤ 1920       Labor hours constraint                                    P1 > 200         Minimum quantity needed...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT