Problem 12-18 (Algorithmic)
A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions:
Contractor | Probability Distribution of Bid |
A | Uniform probability distribution between $530,000 and $730,000 |
B | Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 |
If required, round your answers to three decimal places.
A) If the building contractor submits a bid of $670,000,
what is the probability that the building contractor will obtain
the bid? Use an Excel worksheet to simulate 1,000 trials of the
contract bidding process.
The probability of winning the bid of $670,000 = _____
B) The building contractor is also considering bids of 695,000 and $705,000. If the building contractor would like to bid such that the probability of winning the bid is about 0.6, what bid would you recommend? Repeat the simulation process with bids of $695,000 and $705,000 to justify your recommendation.
The probability of winning the bid of $695,000 = ___
The probability of winning the bid of $705,000 = ___
C) The recommendation would be to choose the bid of $ ____
670,000
695,000
705,000