Question

2. Alex and Charlie start running around a circular track at the same time. The track...

2. Alex and Charlie start running around a circular track at the same time. The track has a radius of 160 meters. Alex starts at the westernmost point and runs counterclockwise, taking 200 seconds to run one lap. Charlie runs clockwise at 3 meters per second and passes Alex for the first time after they have been running for 25 seconds.

(a) From when he begins running, how long does it take Charlie to reach the northern- most point of the track?

(b) How many meters north or south of his starting point is Charlie after he has been running for 1200 seconds? Specify the number of meters, and whether Charlie is north or south of his starting point.

Answers

(a) 150.663706 seconds (b) 260.5559 meters north

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
George and Paula are running around a circular track. George starts at the westernmost point of...
George and Paula are running around a circular track. George starts at the westernmost point of the track, and Paula starts at the easternmost point. The illustration below shows their starting positions and running directions. They start running toward each other at constant speeds. George runs at 8 feet per second. Paula takes 50 seconds to run a lap of the track. George and Paula pass each other after 11 seconds. After running for 3 minutes, how far east of...
George and Paula are running around a circular track. George starts at the westernmost point of...
George and Paula are running around a circular track. George starts at the westernmost point of the track, and Paula starts at the easternmost point. The illustration below shows their starting positions and running directions. They start running toward each other at constant speeds. George runs at 8 feet per second. Paula takes 50 seconds to run a lap of the track. George and Paula pass each other after 14 seconds. After running for 4 minutes, how far east of...
A runner runs around a circular track. He completes one lap at a time of t...
A runner runs around a circular track. He completes one lap at a time of t = 471 s at a constant speed of v = 3.1 m/s. What is the radius, r in meters, of the track? What was the runners centripetal acceleration, ac in m/s2, during the run?
ch 6 1: It is generally a good idea to gain an understanding of the "size"...
ch 6 1: It is generally a good idea to gain an understanding of the "size" of units. Consider the objects and calculate the kinetic energy of each one. A ladybug weighing 37.3 mg flies by your head at 3.83 km/h . ×10 J A 7.15 kg bowling ball slides (not rolls) down an alley at 17.5 km/h . J A car weighing 1260 kg moves at a speed of 49.5 km/h. 5: The graph shows the ?-directed force ??...
read Seasons of Love chapter:measuring a child's life after suicide. please answer the questions : reflect...
read Seasons of Love chapter:measuring a child's life after suicide. please answer the questions : reflect on what happens to the families when there is a suicide in the family, based on the Seasons of Love chapter...how should people be told? What details are best left unshared? below is the story These theories may have a certain face-validity, but they often neglect environmental or contextual factors that are innate to answering the question of “why” a person might engage in...
The Business Case for Agility “The battle is not always to the strongest, nor the race...
The Business Case for Agility “The battle is not always to the strongest, nor the race to the swiftest, but that’s the way to bet ’em!”  —C. Morgan Cofer In This Chapter This chapter discusses the business case for Agility, presenting six benefits for teams and the enterprise. It also describes a financial model that shows why incremental development works. Takeaways Agility is not just about the team. There are product-management, project-management, and technical issues beyond the team’s control. Lean-Agile provides...