Question

consider a 2^6-2 with 16 runs design. using E=ABC, F=BCD we get I=ABCE=BCDF. if we drop...

consider a 2^6-2 with 16 runs design. using E=ABC, F=BCD we get I=ABCE=BCDF. if we drop factor F. the new design should be 2^5-1. construct new design with all signs and write down the alias structure.

no data needed

Homework Answers

Answer #1

Generate the 2^6−2 design with defining relation I = ABCE = BCDF = ADEF
using method

– Generate a 24 design in the first four factors (A, B, C, and D). Then, choose aliases for
E and F that can be expressed only in terms of A, B, C, and D. Use these to determine
the columns for E and F.

E = ABC = BCDEF = ADF F = = =


– Now, multiply the appropriate columns to form columns for E and F

In the 26−2 design with defining relation I = ABCE = BCDF = ADEF,
the effects are aliased as follows:


A = BCE = ABCDF = DEF AD = BCDE = ABCF = EF
B = ACE = CDF = ABDEF AE = = =
C = ABE = BDF = ACDEF AF = = =
D = = = BD = ACDE = CF = ABEF
E = = = BF = ACEF = CD = ABDE
F = ABCEF = BCD = ADE ABD = = =
AB = CE = ACDF = BDEF ACD = BDE = ABF = CEF
AC = BE = ABDF = CDEF I = ABCE = BCDF = ADEF

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider the following bivariate data. Point A B C D E F G H I J...
Consider the following bivariate data. Point A B C D E F G H I J x 4 5 2 6 7 6 2 5 6 5 y 2 6 4 7 7 0 0 1 5 2 (a) Construct a scatter diagram of the given bivariate data. (Do this on paper. Your instructor may ask you to turn in this work.) (b) Calculate the covariance. (Give your answer correct to two decimal places.) (c) Calculate sx and sy. (Give...
Consider the following bivariate data. Point A B C D E F G H I J...
Consider the following bivariate data. Point A B C D E F G H I J x 0 1 1 2 3 4 5 6 6 7 y 5 5 6 5 4 1 2 0 1 1 (a) Construct a scatter diagram of the given bivariate data. (Do this on paper. Your instructor may ask you to turn in this work.) (b) Calculate the covariance. (Give your answer correct to two decimal places.) (c) Calculate sx and sy. (Give...
Consider the following bivariate data. Point A B C D E F G H I J...
Consider the following bivariate data. Point A B C D E F G H I J x 9 8 9 3 7 3 3 4 6 5 y 6 2 2 3 6 3 3 2 4 6 (a) Construct a scatter diagram of the given bivariate data. (Do this on paper. Your instructor may ask you to turn in this work.) (b) Calculate the covariance. (Give your answer correct to two decimal places.) (c) Calculate sx and sy. (Give...
Consider the following bivariate data. Point A B C D E F G H I J...
Consider the following bivariate data. Point A B C D E F G H I J x 0 1 1 2 3 4 5 6 6 7 y 5 5 8 3 4 1 2 0 1 1 (a) Construct a scatter diagram of the given bivariate data. (Do this on paper. Your instructor may ask you to turn in this work.) (b) Calculate the covariance. (Give your answer correct to two decimal places.) (c) Calculate sx and sy. (Give...
Consider the following set of sample data, and find the following (note: if you are using...
Consider the following set of sample data, and find the following (note: if you are using TI 83 to find these values, you need to write down the formulas that you should have used) 19 12 9 19 0 4 3 14 5 5 24 2 5 7 17 (a). Mean (b). Median (c). Mode (d). Standard Deviation (e). Variance (f). Find the z-score for 14. (i). Construct a Box-whisker plot for the data (j). Construct a frequency distribution Table....
Consider a hypothetical economy that has NO tax. ABC Ltd. is considering investing in a 2-year...
Consider a hypothetical economy that has NO tax. ABC Ltd. is considering investing in a 2-year project which is expected to generate the following year-end cash flows: C1 = $110 million, C2 = $115 million. The yearly discount rate for the project is 10%. The initial cost of the project is $200 million. (a) Compute the profit and NPV of the project. (b) Based on the answer of part (a), should the project be accepted? Explain. (c) ABC’s cut-off period...
Curve-Fit Function USING MATLAB Using the top-down design approach, develop a MATLAB function A8P2RAlastname.m that reads...
Curve-Fit Function USING MATLAB Using the top-down design approach, develop a MATLAB function A8P2RAlastname.m that reads data from a file and performs regression analysis using polyfit and polyval. The function shall have the following features: The input arguments shall include the file name (string), a vector of integers for the degrees of polynomial fits to be determined, and an optional plot type specifier (‘m’ for multiple plots, ‘s’ for a single plot - default). The data files will be text...
In a small-scale regression study, we collected data on the number of children in a family...
In a small-scale regression study, we collected data on the number of children in a family Xi and the number of hours per week spent shopping Yi. The following data were obtained: i 1 2 3 4 5 6 Xi 2 6 3 1 1 9 Yi 13 17 12 12 9 22 Assume we performed a simple linear regression of Yi on Xi, i.e. E(Yi) = ?0 + ?1Xi (a) By hand compute X?X, X?Y, (X?X)-1, b, Y^(means Y-hat),...
I did already posted this question before, I did get the answer but i am not...
I did already posted this question before, I did get the answer but i am not satisfied with the answer i did the code as a solution not the description as my solution, so i am reposting this question again. Please send me the code as my solution not the description In this project, build a simple Unix shell. The shell is the heart of the command-line interface, and thus is central to the Unix/C programming environment. Mastering use of...
3.   Consider the following data set for an office structure built by Anderson Construction Co. The...
3.   Consider the following data set for an office structure built by Anderson Construction Co. The completed building is nine stories. However, construction was interrupted by a fire after 5.3357 floors were completed. At the time of the fire, Anderson had used 54,067 hours of labor to construct the first 5.3357 stories of the building. It then took Anderson an additional 40,750 labor hours to complete this nine-story building. In this problem, FLRCOM is the number of floors completed, and...