Question

A farmer plans to plant two crops, A and B.  The cost of cultivating crop A is...

A farmer plans to plant two crops, A and B.  The cost of cultivating crop A is $40/acre, whereas the cost of cultivating crop B is $60/acre.  The farmer has a maximum of $7400 available for land cultivation.  Each acre of crop A requires 20 labor-hours and each acre of crop B requires 25 labor-hours.  The farmer has a maximum of 3300 labor-hours available. If she expects to make a profit of $150/acre on crop A and $200/acre on crop B, how many acres of each crop should she plant to maximize her profit?

a.

70 acres of crop A and 75 acres of crop B

b.

57 acres of crop A and 90 acres of crop B

c.

65 acres of crop A and 80 acres of crop B

d.

50 acres of crop A and 100 acres of crop B

Homework Answers

Answer #1

If you have any questions please let me know

Please give me thumb up..

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A farmer plans to plant two crops, A and B. The cost of cultivating Crop A...
A farmer plans to plant two crops, A and B. The cost of cultivating Crop A is $40/acre whereas the cost of cultivating Crop B is $60/acre. The farmer has a maximum of $7400 available for land cultivation. Each acre of Crop A requires 20 labor-hours, and each acre of Crop B requires 25 labor-hours. The farmer has a maximum of 3300 labor-hours available. If she expects to make a profit of $160/acre on Crop A and $180/acre on Crop...
The Johnson Farm has 500 acres of land allotted for cultivating corn and wheat. The cost...
The Johnson Farm has 500 acres of land allotted for cultivating corn and wheat. The cost of cultivating corn and wheat (including seeds and labor) is $44 and $32 per acre, respectively. Jacob Johnson has $20,200 available for cultivating these crops. If he wishes to use all the allotted land and his entire budget for cultivating these two crops, how many acres of each crop should he plant? (Let x and y denote the number of acres of corn and...
A farmer has a 40-acre farm in Georgia. The farmer is trying to determine how many...
A farmer has a 40-acre farm in Georgia. The farmer is trying to determine how many acres of corn, peanuts, and cotton to plant. Each crop requires labor, fertilizer, and insecticide. The farmer has developed the following linear programming model to determine the number of acres of corn (x1), peanuts (x2), and cotton (x3) to plant in order to maximize profit. Max400(X1) + 350(X2) + 450(X3) s.t. Constraint 1: 2(x1) + 3(X2) + 2(X3) 120labor hours Constraint 2: 4(x1) +...
A farmer is creating a whole farm plan for the upcoming production year. He has 800...
A farmer is creating a whole farm plan for the upcoming production year. He has 800 acres of land available for crop production. He wants to maximize his gross margin of two crops, soybeans and corn. He believes that he can obtain a gross margin of $80 per acre of soybeans and $100 per acre of corn. He has 3500 available labor hours to allocate between the two crops and has determined that soybeans will require 2.5 hours of labor...
Problem 1-1: A farmer owns 450 acres of land. He is going to plant each acre...
Problem 1-1: A farmer owns 450 acres of land. He is going to plant each acre with wheat or corn. Each acre planted with wheat yields $4000 profit, requires three workers, and requires two tons of fertilizer. Each acre planted with corn yields $2000 profit, requires two workers, and requires four tons of fertilizer. There are currently 1000 workers and 1200 tons of fertilizer available. To hedge against risk, the farmer wants to sure that the acres of wheat do...
The seasonal yield of olives in a Piraeus, Greece, vineyard is greatly influenced by a process...
The seasonal yield of olives in a Piraeus, Greece, vineyard is greatly influenced by a process of branch pruning. If olive trees are pruned every two weeks, output is increased. The pruning process, however, requires considerably more labor than permitting the olives to grow on their own and results in a smaller size olive. It also permits olive trees to be spaced closer together. The yield of 1 barrel of olives by pruning requires 5 hours of labor and 1...
CyclePath Company produces two different products that have the following price and cost characteristics: Bicycle Tricycle...
CyclePath Company produces two different products that have the following price and cost characteristics: Bicycle Tricycle Selling price per unit 100 400 Variable cost per unit 40 240 Management believes that pushing sales of the Bicycle product would maximize company profits because of the high contribution margin per unit for this product. However, only 50,000 labor hours are available each year, and the Bicycle product requires 4 labor hours per unit while the Tricycle model requires 2 labor hours per...
Scott, Inc. plans to manufacture scooters for commuters. The company expects to have two models, the...
Scott, Inc. plans to manufacture scooters for commuters. The company expects to have two models, the “C” and the “R” models. The company will use activity-based costing to apply its estimated $145,000 of overhead costs to its products. Information about its overhead follows: Activity (Cost Driver) Estimated MOH Expected Activity Total               C Model R Model Assembly (Labor Hours) $20,000 10,000 6,000 4,000 Quality control (Inspection Hours) 35,000 2,000 600 1,400 Parts Admin (Number of Parts) 90,000 100 40 60...
A) Perth Mining Company operates two mines for the purpose of extracting gold and silver. The...
A) Perth Mining Company operates two mines for the purpose of extracting gold and silver. The Saddle Mine costs $16,000/day to operate, and it yields 60 oz of gold and 3000 oz of silver each of x days. The Horseshoe Mine costs $18,000/day to operate, and it yields 80 oz of gold and 1250 oz of silver each of y days. Company management has set a target of at least 700 oz of gold and 17,000 oz of silver. How...
Cane Company manufactures two products called Alpha and Beta that sell for $210 and $172, respectively....
Cane Company manufactures two products called Alpha and Beta that sell for $210 and $172, respectively. Each product uses only one type of raw material that costs $8 per pound. The company has the capacity to annually produce 128,000 units of each product. Its unit costs for each product at this level of activity are given below: Alpha Beta   Direct materials $ 40 $ 24   Direct labor 38 34   Variable manufacturing overhead 25 23   Traceable fixed manufacturing overhead 33 36...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT