Prepare Job-Order Cost Sheets, Predetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and COGS
At the beginning of March, Mendez Company had two jobs in process, Job 86 and Job 87, with the following accumulated cost information:
Job 86 | Job 87 | |
Direct materials | $4,800 | $1,600 |
Direct labor | 1,200 | 3,000 |
Applied overhead | 888 | 2,220 |
Balance, March 1 | $6,888 | $6,820 |
During March, two more jobs (88 and 89) were started. The following direct materials and direct labor costs were added to the four jobs during the month of March:
Job 86 | Job 87 | Job 88 | Job 89 | |
Direct materials | $3,000 | $7,000 | $2,100 | $1,500 |
Direct labor | 800 | 6,000 | 900 | 500 |
At the end of March, Jobs 86, 87, and 89 were completed. Only Job 87 was sold. On March 1, the balance in Finished Goods was zero.
Required:
1. Calculate the overhead rate based on direct labor cost.
$ %
2. Prepare a brief job-order cost sheet for the four jobs. Show the balance as of March 1 as well as direct materials and direct labor added in March. Apply overhead to the four jobs for the month of March, and show the ending balances.
Mendez Company | ||||
Job-Order Cost Sheets | ||||
For the Month of March | ||||
Job 86 | Job 87 | Job 88 | Job 89 | |
Beginning balance, March 1 | $ | $ | $ | $ |
Direct materials | ||||
Direct labor | ||||
Applied overhead | ||||
Total, March 31 | $ | $ | $ | $ |
3. Calculate the ending balances of Work in Process and Finished Goods as of March 31.
Work in Process: $
Finished Goods: $
4. Calculate the Cost of Goods Sold for March.
$
1. Calculate the overhead rate based on direct labor cost.
Overhead rate = Overhead applied*100/direct labour cost
= 888*100/1200
Overhead rate = 74% of direct labour cost
2. Prepare a brief job-order cost sheet for the four jobs.
Job 86 | Job 87 | Job 88 | Job 89 | |
Beginning balance, March 1 | 6888 | 6820 | ||
Direct materials | 3000 | 7000 | 2100 | 1500 |
Direct labour | 800 | 6000 | 900 | 500 |
Applied overhead | 592 | 4440 | 666 | 370 |
Total March 31 | 11280 | 24260 | 3666 | 2370 |
3. Calculate the ending balances of Work in Process and Finished Goods as of March 31.
Work in process = Job 88 = 3666
Finished goods = 11280+2370 = 13650
4. Calculate the Cost of Goods Sold for March.
Cost of goods sold = $24,260