X Company's 2019 budgeted overhead cost function was C=$9.90X +
$200,900, where X is the number of units produced. The following
information is also available for 2019:
Master | Actual | |
Budget | Results | |
Production | 10,700 units | 13,100 units |
Total variable costs | $105,930 | $151,659 |
Total fixed costs | $200,900 | $204,158 |
1. What was the total overhead static budget for 2019?
1. What was the total overhead static budget for 2019?
A: $129,690 | B: $306,830 | C: $310,088 | D: $330,590 | E: $333,848 | F: $355,817 |
answer:
2. What was the total overhead flexible budget variance for 2019
[a positive number means a favorable variance and a negative number
means an unfavorable variance]?
A: $-48,987 | B: $-45,729 | C: $-30,272 | D: $-25,227 | E: $-21,969 |
F: $-20,182 |
answer:
Master Budget | Actual Result | ||||
1 | Production | 10700 | 13100 | ||
Total Variable Costs | 105930 | 151659 | |||
Total Fixed Costs | 200900 | 204158 | |||
Total Overhead Cost | 355817 | ||||
Budgeted Overhead Costs: | |||||
C=9.9X+200900 | |||||
C=9.9(10700)+200900 | |||||
306830 | |||||
Answer is B | |||||
2 | Budgeted Overhead Cost | 306,830 | |||
Less: OH Cost at Flexible Budget | 355,817 | ||||
Variance-Unfavourable | - 48,987 | ||||
A | |||||