Activity-based costing systems:
Question 3 options:
use a single predetermined overhead rate based on machine hours instead of on direct labor |
|
always result in an increase of at least one product’s selling price |
|
limit the number of cost pools |
|
frequently increase the overhead allocation to at least one product while decreasing the overhead allocation to at least one other product |
Activity-based costing systems frequently increase the overhead allocation to at least one product while decreasing the overhead allocation to at least one other product |
The overhead allocated to low volume products can increase and the overhead allocated to high volume products can decrease under Activity-based costing systems. |
Activity-based costing systems uses multiple overhead rates based on activity cost pool. |
Activity-based costing systems does not limit the number of cost pools. |
Option D is correct |