Question

Activity-based costing systems: Question 3 options: use a single predetermined overhead rate based on machine hours...

Activity-based costing systems:

Question 3 options:

use a single predetermined overhead rate based on machine hours instead of on direct labor

always result in an increase of at least one product’s selling price

limit the number of cost pools

frequently increase the overhead allocation to at least one product while decreasing the overhead allocation to at least one other product

Homework Answers

Answer #1
Activity-based costing systems frequently increase the overhead allocation to at least one product while decreasing the overhead allocation to at least one other product
The overhead allocated to low volume products can increase and the overhead allocated to high volume products can decrease under Activity-based costing systems.
Activity-based costing systems uses multiple overhead rates based on activity cost pool.
Activity-based costing systems does not limit the number of cost pools.
Option D is correct
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
4A. Harootunian Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based...
4A. Harootunian Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 80,000 Total fixed manufacturing overhead cost $ 312,000 Variable manufacturing overhead per machine-hour $ 2.10 Recently, Job T629 was completed with the following characteristics: Number of units in the job 50 Total machine-hours 200 The predetermined overhead rate is closest to: Multiple Choice $8.10 per...
Cull Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Cull Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $370,500, variable manufacturing overhead of $3.00 per machine-hour, and 57,000 machine-hours. The company has provided the following data concerning Job X455 which was recently completed: Number of units in the job 10 Total machine-hours 80 Direct materials $ 750 Direct labor cost $ 1,500 If...
Cull Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Cull Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $546,700, variable manufacturing overhead of $2.00 per machine-hour, and 77,000 machine-hours. The company has provided the following data concerning Job X455 which was recently completed: Number of units in the job 20 Total machine-hours 80 Direct materials $ 840 Direct labor cost $ 1,680 If...
10. Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based...
10. Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 32,500 Total fixed manufacturing overhead cost $455,000 Variable manufacturing overhead per machine-hour $ 5.00 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 710 Direct labor cost $1,420 If the company marks...
the method of determining overhead allocation using absorption costing and that under activity-based costing differs because:...
the method of determining overhead allocation using absorption costing and that under activity-based costing differs because: a. activity-based costing allocates costs to cost pools and traces costs to products based on cost driveres whereas absorption costing allocates costs to cost centers and then to products based on a measure of activity such as direct labor hours b. activity-based costing can never accurately allocate overheads to products because the method of allocation is arbitrary whereas absorption costing is always more reliable...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 32,000 Total fixed manufacturing overhead cost $ 352,000 Variable manufacturing overhead per machine-hour $ 3.00 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 675 Direct labor cost $ 1,350 The amount of...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 30,000 Total fixed manufacturing overhead cost $ 252,000 Variable manufacturing overhead per machine-hour $ 2.10 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 30 Direct materials $ 675 Direct labor cost $ 1,050 The estimated total...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 30,200 Total fixed manufacturing overhead cost $ 120,800 Variable manufacturing overhead per machine-hour $ 6 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 40 Direct materials $ 710 Direct labor cost $ 1,410 The total job...
Mcewan Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...
Mcewan Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on 26,000 direct labor-hours, total fixed manufacturing overhead cost of $195,000, and a variable manufacturing overhead rate of $2.10 per direct labor-hour. Job X941, which was for 50 units of a custom product, was recently completed. The job cost sheet for the job contained the following data: Total direct labor-hours 400...
Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours....
Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 153,000 Fixed manufacturing overhead cost $ 654,000 Variable manufacturing overhead cost per machine-hour $ 4.70 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials $...