Question

Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity...

Two-Stage ABC for Manufacturing
Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity cost pools and cost driver levels for the latest period:

Activity cost pool Activity cost Activity cost driver
Machine setup $950,000 2,500 setup hours
Material handling 520,000 5,000 material moves
Machine operation 200,000 20,000 machine hours

The following data are for the production of single batches of two products, Mirlite and Subdue:

Mirlite Subdue
Gallons produced 30,000 20,000
Direct labor hours 500 250
Machine hours 800 350
Direct labor cost $10,000 $7,500
Direct materials cost $350,000 $150,000
Setup hours 15 12
Material moves 40 35

Determine the batch and unit costs per gallon of Mirlite and Subdue using ABC. (Round your answers to the nearest cent.)
Mirlite $Answer

per gallon
Subdue $Answer per gallon

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity cost pool Activity cost Activity cost driver Machine setup $600,000 12,000 setup hours Material handling 60,000 2,000 tons of materials Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts: C23 Cams U2 Shafts Units produced 500 100...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the...
Two-Stage ABC for Manufacturing Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity cost pool Activity cost Activity cost driver Machine setup $600,000 12,000 setup hours Material handling 180,000 2,000 tons of materials Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts: C23 Cams U2 Shafts Units produced 500 200...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information for its 2016 manufacturing activities: Budgeted Activity Cost Activity Cost Driver at Practical Capacity Purchasing and materials handling $675,000 900,000 kilograms Setup 700,000 1,120 setups Machine operations 954,000 12,000 hours First unit inspection 50,000 1,000 batches Packaging 250,000 312,500 units Actual 2016 production information is as follows: Standard Product A Standard Product B Specialty Products Units 150,000 100,000 50,000 Batches 100 80 600 Setups*...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers...
Westerner Manufacturing has established the following cost pools for this year: Cost Pool Costs Cost Drivers Maintenance $20,000 10,000 machine hours Material handling $25,000 250 moves Machine setup $30,000 1,000 hours Inspection $25,000 500 inspections Total $100,000 N/A The following information pertains to two representative jobs completed during January: Item Job 101 Job 102 Direct materials $10,000 $7,500 Direct labor $8,000 $5,000 Units produced 2,000 1,500 Direct labor hours 640 400 Machine hours 700 650 Number of material moves 40...
The company uses ABC and has determined the following activities, cost drivers and activity rates Activity...
The company uses ABC and has determined the following activities, cost drivers and activity rates Activity Center Activity Driver Activity rate Direct labor usage Direct labor hours $3 per DL hr Machine usage Machine hours $8 per machine hr Machine setups Setups $200 per set up Design changes Design changes $400 per design change You have completed Job 101. Determine the cost of Job 101, if the job required $1,000 in Direct Material, $3,000 in Direct Labor, 500 direct labor...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
Believing that its traditional cost system may be providing misleading information, Farragut Manufacturing is considering an...
Believing that its traditional cost system may be providing misleading information, Farragut Manufacturing is considering an activity-based costing (ABC) approach. It now employs a traditional cost system and has been applying its manufacturing overhead on the basis of machine hours. Farragut plans on using 50,000 direct labor hours and 30,000 machine hours in the coming year. The following data show the manufacturing overhead that is budgeted. Budgeted Budgeted Activity Cost Driver Activity Cost Material handling No. of parts handled 6,000,000...
ABC uses activity based costing where overhead from three different production departments are allocated to products...
ABC uses activity based costing where overhead from three different production departments are allocated to products as follows: Activity                                     Driver                                        Activity Rate                                         Product A              Product B Cutting                                     Machine Hours                                     $2.00 per machine hour                                2,000 hours        3,000 hours Assembly              Assembly Hours                 $.50 per assembly hour                                   3,000 hours        5,000 hours Painting                 Gallons of Paint                                   $5.00 per gallon                                  1,500 gallons     1,300 gallons Raw materials are directly followed to each product and the amount of raw materials used for...
ABC uses activity based costing where overhead from three different production departments are allocated to products...
ABC uses activity based costing where overhead from three different production departments are allocated to products as follows: Activity - Driver - Activity Rate - Product A - Product B Cutting - Machine Hours - $2.00 per machine hour - 2,000 hours - 3,000 hours Assembly - Assembly Hours - $.50 per assembly hour - 3,000 hours - 5,000 hours Painting - Gallons of Paint - $5.00 per gallon - 1,500 gallons - 1,300 gallons Raw materials are directly followed...
Tioga Company manufactures sophisticated lenses and mirrors used in large optical telescopes. The company is now...
Tioga Company manufactures sophisticated lenses and mirrors used in large optical telescopes. The company is now preparing its annual profit plan. As part of its analysis of the profitability of individual products, the controller estimates the amount of overhead that should be allocated to the individual product lines from the following information. Lenses Mirrors United Produced   24 24 Material moves per product line 22 12 Direct-labor hours per unit 240 240 The total budgeted material-handling cost is $61,440. Required: 1....