Two-Stage ABC for Manufacturing
Columbus Foundry, a large manufacturer of heavy equipment
components, has determined the following activity cost pools and
cost driver levels for the year:
Activity cost pool | Activity cost | Activity cost driver |
---|---|---|
Machine setup | $600,000 | 12,000 setup hours |
Material handling | 60,000 | 2,000 tons of materials |
Machine operation | 500,000 | 10,000 machine hours |
The following data are for the production of single batches of two products, C23 Cams and U2 Shafts:
C23 Cams | U2 Shafts | |
---|---|---|
Units produced | 500 | 100 |
Machine hours | 3 | 5 |
Direct labor hours | 400 | 400 |
Direct labor cost | $5,000 | $10,000 |
Direct materials cost | $30,000 | $20,000 |
Tons of materials | 12.5 | 8 |
Setup hours | 4 | 9 |
Determine the unit costs of C23 Cams and U2 Shafts using
ABC.
C23 Cams $Answer
U2 Shafts $Answer