Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 152,000 Fixed manufacturing overhead cost $ 654,000 Variable manufacturing overhead cost per machine-hour $ 5.00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials $ 310 Direct labor cost $ 280 Machine-hours used 39 Compute the total manufacturing cost assigned to Job 400. 3. If Job 400 includes 50 units, what is the unit product cost for this job? 4. If Moody uses a markup percentage of 110% of its total manufacturing cost, then what selling price per unit would it have established for Job 400?
Answer :
(1) Plantwide predetermined overhead rate = Fixed overhead rate + Variable overhead rate
= $ 654000/ 152000 + $ 5
= $ 4.30 + $ 5 = $ 9.30
(2) total manufacturing cost assigned to Job 400
Direct material | $ 310 |
Direct Labor | $ 280 |
Manufacturing overhead applied( 39 hour * $ 9.30) | $ 362.70 |
total manufacturing cost assigned to Job 400 |
$ 952.70 |
(3) Unit product cost = total manufacturing cost assigned to Job 400/ Number of unit
= $ 952.70 / 50 = $ 19.054
( 4) Selling price = $ 19.054 + $ 19.054 * 110 %
= $ 40.01