Vaughn Manufacturing purchased land as a factory site for
$1330000. Vaughn paid $112000 to tear down two buildings on the
land. Salvage was sold for $8100. Legal fees of $5000 were paid for
title investigation and making the purchase. Architect's fees were
$46300. Title insurance cost $3500, and liability insurance during
construction cost $3800. Excavation cost $15440. The contractor was
paid $4400000. An assessment made by the city for pavement was
$9600. Interest costs during construction were $257000.
The cost of the building that should be recorded by Vaughn
Manufacturing is
$4407040. |
$4419700. |
$4722540. |
$4405800. |
Sol. Calculation fro determining Cost of Building to be recorded
Particulars | Amount (in $) | |
Contractor Charges | 4400,000 | |
Add: | Purchase of Land (to be included in Land Cost) | 0 |
Add: | Cost for tear down buildings (to be included in Land Cost) | 0 |
Less: | Salvage Value from scrap (to be deducted from cost of land) | 0 |
Add: | Legal Fees (to be included in cost of land) | 0 |
Add: | Architect's Fees | 46,300 |
Add: | Title insurance cost (to be included in cost of land) | 0 |
Add: | Liability insurance during construction cost | 3,800 |
Add: | Excavation Cost | 15,440 |
Add: | Pavement assessment cost (to be included in cost of land) | 0 |
Add: | Interest cost during constuction | 257,000 |
Total Cost of Building | 4,722,540 |