Question

Question 1 Activity Based Costing for Kota Mills (25 marks) Kota Mills supply Divine Denim with...

Question 1 Activity Based Costing for Kota Mills

Kota Mills supply Divine Denim with the organic denim used in their production. After discussions with Helen about the service she was getting from Good Numbers, the manager of Kota Mills decided to use Good Numbers to assist with their management decision making. Kota Mills produces three different weights of denim using two departments. In Department 1, machines weave the cloth. In Department 2 the cloth is dyed a variety of colours. Information for the combined use of resources in both departments for the three types of fabric is outlined below.

Bolts are 20 metres each. All fabric is inspected during production. Robotic equipment inspects the fabric for obvious flaws as the bolts are wound up. Each bolt spends about 5 minutes in the inspection process.

Denim
8 ounce 13 ounce 16 ounce Total units
Monthly production in units (bolts of fabric) 1,000 4,000 2,000 7,000 bolts
Direct material cost $ 8,000 24,000 20,000 52,000 $
Direct labour cost $ 660 1,320 920 2,900 $
Direct labour hours 33 66 46 145 hours
Machine hours 500 1,333 1,500 3,333 hours
Number of set-ups for dye colour changes 10 30 20 60 set-ups
Inspection time 83 333 167 583 hours

Combined overhead costs for the two departments follow:

Cost to operate and maintain machines $ 40,000
Set-up costs $ 11,000
Inspection costs $ 6,996
Total $ 57,996

Previously, Kota Mills used a costing system focused on processes. It allocated direct materials to each product separately but allocated direct labour and conversion costs as if they were incurred equally across the units produced. Under this costing system, the overhead cost for Department 1 is $19,332 and for Department 2 it is $38,664. Direct labour hours and costs in Department 1 are 55 hours at $1,100, and the remaining are in Department 2. Direct materials for Department 1 are $15,000 for 16 ounce denim, $16,000 for 13 ounce denim, and $6,000 for 8 ounce denim. The remaining direct materials are added in Department 2. No beginning or ending inventory or abnormal spoilage is recorded for Kota Mills this period.

Required:

  1. Set up a spreadsheet to perform the calculations in ii. and iii. below. Use a data input section and cell referencing.
  2. Use conventional process costing to allocate the direct materials and conversion costs per department to total bolts produced. Develop a cost per bolt for each type of fabric. (Hint: You will need to first calculate the equivalent cost per bolt for conversion costs for each department.)
  3. Using activity-based costing (ABC), develop a cost per bolt.
  4. Compare the process costing and ABC results. Identify the products with overstated costs and those with understated costs. Explain why the costs are misstated under traditional process costing.
  5. How could the Kota Mills manager use the ABC information to improve operations? (max 200 words)

Presentation: Cut and paste your spreadsheet results and formula view into your word document. The formula view should include the column letters and the row numbers.

Homework Answers

Answer #1

HOPE THIS ANSWER IS USEFUL. PLEASE LIKE THE ANSWER

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Question 3. Activity-Based Costing (ABC)   (20 marks) This question builds on prior studies and relates to...
Question 3. Activity-Based Costing (ABC)    This question builds on prior studies and relates to learning material and objectives from Topic 6. Jupiter Australasia Ltd owns Victory Mowers a manufacturer of gardening equipment which is sold domestically within Australia and to an increasing export market. Victory Mowers manufactures two different models of lawnmowers: the cheaper ‘Lawnmaster’ and the environmentally-friendly and more expensive ‘Green Machine’. A dispute has arisen between senior management at Victory Mowers over the strategic direction of the...
Part 1 ABC uses activity based costing where overhead from three different production departments are allocated...
Part 1 ABC uses activity based costing where overhead from three different production departments are allocated to products as follows: Activity                 Driver - Activity Rate - Product A - Product B Cutting Machine Hours - $2.00 per machine hour - 2,000 hours - 3,000 hours Assembly            Assembly Hours - $.50 per assembly hour - 3,000 hours - 5,000 hours Painting                Gallons of Paint - $5.00 per gallon - 1,500 gallons - 1,300 gallons Raw materials are directly followed to...
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns...
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns the cost of each activity with resources to all products and services according to the actual consumption by each. Do you think Activity-Based Costing (ABC) has any advantages if so discuss few advantages and also the challenges of this system and how we can resolve it?    Q2. ALHAMAD Corporation uses process costing. A number of transactions that occurred in December are listed below....
Question 4 Applying overhead using activity based costing for the following 2 models of boats Cost...
Question 4 Applying overhead using activity based costing for the following 2 models of boats Cost Driver                                   Annual Cost          Total Activity Production order set-up                  $147,600               4,800 set-ups Raw Material ordering                   $216,800                8,000 items ordered Product cleaning                          $1,680,200                   775 inspection approvals Equipment usage                          $948,500              12,500 machine hours Cost Driver                                    Activity Required                  Activity Required                                                       Viking-star  (117 units)           Lion-star (86 units) Production order set-up                  1,084 set-ups                     976 set-ups Raw Material ordering                    2,050 items ordered            3,690 items ordered Product cleaning                             201 inspec. app                 41 inspec. app Equipment...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool...
The following data regarding the activity-based costing system at the Company Co. is available: Activity Pool Base Budgeted Activity Budgeted Cost Machine set up # of setups 2710 $24804 Orders # of orders 991 $96484 Shipping Hours of shipping time 2233 $41621 In addition, prior to adopting an activity based costing system, Company Co. applied overhead based on direct labour hours. The budgeted total labour hours for the year was 54645. If one job required 424 direct labour hours, 39...
James Company uses process costing to track its costs in two sequential production departments: Forming and...
James Company uses process costing to track its costs in two sequential production departments: Forming and Finishing. The following information is provided regarding the Forming Department: Forming Department Month Ended July 31 Unit information Beginning work in process, July 1 --- 6,000 Started into production during July --- 18,000 Completed and transferred to Finished Department during July --- 16,000 Ending work in process, July 31 (30% complete as to direct materials and 40% complete as to conversion costs) --- 8,000...
(TCO 3) James Company uses process costing to track its costs in two sequential production departments:...
(TCO 3) James Company uses process costing to track its costs in two sequential production departments: Forming and Finishing. The following information is provided regarding the Forming Department: Forming Department Month Ended July 31 Unit information Beginning work in process, July 1 --- 6,000 Started into production during July --- 18,000 Completed and transferred to Finished Department during July --- 16,000 Ending work in process, July 31 (30% complete as to direct materials and 40% complete as to conversion costs)...
Timekeeper Inc. manufactures clocks on a highly automated assembly line. Its costing system uses two cost​...
Timekeeper Inc. manufactures clocks on a highly automated assembly line. Its costing system uses two cost​ categories, direct materials and conversion costs. Each product must pass through the Assembly Department and the Testing Department. Direct materials are added at the beginning of the production process. Conversion costs are allocated evenly throughout production. Timekeeper Inc. uses weighted-average costing. Data for the Assembly Department for June 2017 are​:       Work in​ process, beginning inventory 360 units            Direct materials​ (100% complete)            Conversion costs ​(55​%...
Hudson Dock Company manufactures boat docks on an assembly line. Its standard costing system uses two...
Hudson Dock Company manufactures boat docks on an assembly line. Its standard costing system uses two costs categories, direct materials and conversion costs. Each tractor must pass through the Assembly Department and the Finishing Department. Direct materials are added at the beginning of the production process. Conversion costs are allocated evenly throughout production. Data for the Assembly Department for May 20X5 are: Work in process, beginning inventory 70 units Direct materials (100% complete) Conversion costs (25% complete) Units started during...
Q3.ABC corporation applying normal costing system has provided the following data from its activity-based costing system...
Q3.ABC corporation applying normal costing system has provided the following data from its activity-based costing system as follows: (Amounts in SAR)                                           [3 Marks] Activities Estimated Overhead Costs Expected Cost Drivers Quantities Cost Drivers Assembly 120,500 10,000 Number of Machine Hours Processing Orders 80,500 7,000 Number of Orders Inspection 75,500 5,000 Number of Inspection Hours Total 276,000 22,000 Actual Data concerning the company's product X appears below: Annual unit production and sales 500 units Annual machine hours 5,000 Annual number of...