Question

There are 400 working minutes available in a shift, 3 shifts per day, and 20 working...

There are 400 working minutes available in a shift, 3 shifts per day, and 20 working days in a month. The following data applies:

Demand Rate (pieces per month)=14,274
Process 1 Time (minutes)= 103.1
Process 2 Time (minutes)= 155.9
Process 1 Lead Time (hours)= 14
Process 2 Lead Time (hours)= 13
Process 1 Defect Rate= 0.06
Process 2 Defect Rate= 0.03

How many inventory turns are there per year?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Calculate the OEE for a plant that operates as follows: - 3 Shifts of 8 hours...
Calculate the OEE for a plant that operates as follows: - 3 Shifts of 8 hours each - Shift 3 is not operating for a while - Lunch break per shift = 30 minutes - Service Talk: 10 minutes per shift - Set up per shift : 75 minutes - Breakdown Shift 1 = 75 minutes - Breakdown Shift 2 = 65 minutes - Speed Losses (idle & minor losses) ; 225 minutes - Time used to create (make) defects...
1. For a particular operation, the setup time is 10 minutes and the run time is...
1. For a particular operation, the setup time is 10 minutes and the run time is 50 minutes to produce a standard lot of 40 parts. It takes three additional hours to circulate a container of parts after production is completed. The demand rate is 20,000 parts per month. There are 160 production hours in a month. a. How many standard containers are needed? n = D(T) / C Use the following inputs: Demand rate (D) = ________ parts /...
Omatic Tech Ebike is producing wheels for a 3 wheeled e-bike at the rate of 2...
Omatic Tech Ebike is producing wheels for a 3 wheeled e-bike at the rate of 2 pcs/hr/worker. At present, the company has 18 workers equally distributed 3 shifts of 6am to 2pm , 2pm to 10pm and 10pm to 6am, with 45 min break per shift. The worker-machine ratio is 1:1. The company has 8 machines available at any given time. They operate 5 days per week.   Multiple Choice: A. How cam maximum capacity for a week be computed? (...
A scraper, pusher, and a truck are working together, at 50 minutes per hour; on a...
A scraper, pusher, and a truck are working together, at 50 minutes per hour; on a construction site to move a volume of load that is 20 m3. If both hauling and returning time together = 4.5 min, both loading and dumping time together = 1.2 min, turn time = 0.5 min (at both cut and fill sites together), pusher time is 1.3 min, using SI units (kilogram – meter): 1. Find the cycle time. 2. Find the number of...
Question 3:                                        &nbs
Question 3:                                                                                                            [18 marks] You need to prepare the budget for Yellow tree for the quarter ending June 2018. The budget must be prepared monthly. The quarter consists of 13 weeks. The forecasted sales are as follows: April 4 weeks May 5 weeks June 4 weeks July 4 weeks Sales Units 1,250 1,500 1,750 1,800 The company’s policy changed the inventory policy to keep closing inventory of completed units at 25% of the following month’s sales. Opening inventory on the...
In an effort to evaluate performance and determine where improvements can be made, management has gathered...
In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control measures: Number of defects 201 179 140 98 Number of warranty claims 62 55 46 43 Number of customer complaints 118 112 95 74 Material control measures: Purchase order lead time 10 days 9 days 7 days 5 days Scrap as a percent of total cost...
vThere are 3 steps in a laundry shop: i) Washing, ii) Drying, iii) Folding. If we...
vThere are 3 steps in a laundry shop: i) Washing, ii) Drying, iii) Folding. If we assume the time to do each load is 25, 50 and 35 minutes, respectively. We can assume that there is no variability in the process and all operations work fully efficiently. a) What is the Lead Time of the laundry shop? b) What is the Cycle Time? What is the throughput rate (loads per hour) of the laundry? c) What is the utilization %...
Question 3: [18 marks] You need to prepare the budget for Yellow tree for the quarter...
Question 3: [18 marks] You need to prepare the budget for Yellow tree for the quarter ending June 2018. The budget must be prepared monthly. The quarter consists of 13 weeks. The forecasted sales are as follows: April 4 weeks May 5 weeks June 4 weeks July 4 weeks Sales Units 1,250 1,500 1,750 1,800 The company’s policy changed the inventory policy to keep closing inventory of completed units at 25% of the following month’s sales. Opening inventory on the...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months:    Month 1 2 3 4 Quality...
1) Susan has a part-time "cottage industry" producing seasonal plywood yard ornaments for resale at local...
1) Susan has a part-time "cottage industry" producing seasonal plywood yard ornaments for resale at local craft fairs and bazaars. She currently works 8 hours per day to produce 16 ornaments. a. What is her productivity? b. She thinks that by redesigning the ornaments and switching from use of a wood glue to a hot-glue gun she can increase her total production to 20 ornaments per day. What is her new productivity? c. What is her percentage increase in productivity?...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT