Fogerty Company makes two products—titanium Hubs and Sprockets. Data regarding the two products follow: Direct Labor-Hours per Unit Annual Production Hubs 0.60 16,000 units Sprockets 0.20 53,000 units Additional information about the company follows: Hubs require $21 in direct materials per unit, and Sprockets require $16. The direct labor wage rate is $17 per hour. Hubs require special equipment and are more complex to manufacture than Sprockets. The ABC system has the following activity cost pools: Estimated Activity Activity Cost Pool (Activity Measure) Overhead Cost Hubs Sprockets Total Machine setups (number of setups) $ 29,160 120 96 216 Special processing (machine-hours) $ 230,000 4,600 0 4,600 General factory (organization-sustaining) $ 73,200 NA NA NA Required: 1. Compute the activity rate for each activity cost pool. 2. Determine the unit product cost of each product according to the ABC system.
1 | |||
Activity | Activity rate | ||
Machine setups | 135 | per setup | =29160/216 |
Special processing | 50 | per machine-hour | =230000/4600 |
2 | |||
Hubs | Sprockets | ||
Machine setups | 16200 | 12960 | |
Special processing | 230000 | 0 | |
Total overhead | 246200 | 12960 | |
Divided by units | 16000 | 53000 | |
Overhead per unit | 15.39 | 0.24 | |
Hubs | Sprockets | ||
Direct materials | 21 | 16 | |
Direct labor | 10.2 | 3.4 | |
Overhead per unit | 15.39 | 0.24 | |
Unit product cost | 46.59 | 19.64 |