cycle Time Example Problem
An order for Order Quantity of a product is processed on work centers A and B. The setup time on A is Work Centre A - Setup Time, and run time is Work Centre A - Run Time Per Piece. The setup time on B is Work Centre B - Setup Time, and the run time is Work Centre B - Run Time Per Piece. Wait time between the two operations is Wait time after Work Center A (Minutes). The move time between A and B is Move Time from A to B. Wait time after operation B is Wait Time after Work Center B (Minutes), and the move time into stores is Move Time from B to Stores. There is no queue at either workstation. Calculate the total manufacturing lead time for the order.Use the data on the spreadsheet to make your calculation. Note: Provide all answers as whole numbers.
Note: All fields above in bold are provided on the Excel spreadsheet.
Cycle Time Example Problem
Time (Minutes)
Work Centre A - Setup Time 32
Work Centre A - Run Time Per Piece 11
Wait time after Work Center A (Minutes) 182
Move Time from A to B 11
Work Centre B - Setup Time 39
Work Centre B - Run Time Per Piece 5
Wait Time after Work Center B (Minutes) 209
Move Time from B to Stores 19
Order Quantity 116
TOTAL CYCLE TIME (Minutes)
total cycle time = process time+inspection time+move time+ |
|||
wait time+ any other time during production. |
|||
In the case, the Total Cycle time= |
|||
total quantity = 116 |
In minutes |
In minutes |
|
work centre A |
Setup time |
32 |
32 |
Run time |
116*11 |
1276 |
|
wait time |
after A |
182 |
182 |
move time |
A to B |
11 |
11 |
work centre B |
Set up time |
39 |
39 |
Run time |
116*5 |
580 |
|
wait time |
after B |
209 |
209 |
move time |
B to store |
19 |
19 |
Total Cycle time = |
2348 |