Wait 3.0 days Move 0.5 days
Inspection 0.4 days Queue 9.3 days
Process 0.2 days
What is the throughput time?
1)correct option is a"
An Activity cost pool is a “bucket” in which costs are accumulated that relate to a single activity measure in the ABC system.
2)correct option is "b"
When batch-level and product-level costs are present, ABC will usually shift costs from high volume products, produced in large batches, to low volume products produced in small batches.
3)Correct option is a"
A continuous is a 12-month budget that rolls forward one month as the current month is completed.
4)correct option is"b" -sales budget
The sales budget is the first step in the preparation of budget thus it is called mother of all budgets .
5)correct option is "b"-
Flexible budget Show the costs that should have been incurred at
the actual level of activity so as to provide effective cost
comparisions
activity, enabling “apples to apples” cost comparisons.