Single Plantwide Factory Overhead Rate
Spotted Cow Dairy Company manufactures three products—whole milk, skim milk, and cream—in two production departments, Blending and Packing. The factory overhead for Spotted Cow Dairy is $282,100.
The three products consume both machine hours and direct labor hours in the two production departments as follows:
Direct Labor Hours | Machine Hours | ||||||
Blending Department | |||||||
Whole milk | 330 | 780 | |||||
Skim milk | 360 | 710 | |||||
Cream | 290 | 280 | |||||
980 | 1,770 | ||||||
Packing Department | |||||||
Whole milk | 390 | 510 | |||||
Skim milk | 620 | 630 | |||||
Cream | 180 | 190 | |||||
1,190 | 1,330 | ||||||
Total | 2,170 | 3,100 |
Required:
1. Determine the single plantwide factory overhead rate, using each of the following allocation bases: (a) direct labor hours and (b) machine hours. If required, round all amounts to the nearest dollar.
a. Direct labor overhead rate | $ per direct labor hour |
b. Machine hour overhead rate | $ per machine hour |
2. Determine the product factory overhead costs, using (a) the direct labor hour plantwide factory overhead rate and (b) the machine hour plantwide factory overhead rate.
Whole Milk | Skim Milk | Cream | |
Direct labor hours | $ | $ | $ |
Machine hours | $ | $ | $ |
1.
Total factory overheads= $282,100
Total direct labour hours = 2,170 hours
Total Machine hours= 3,100 hours
(a) Direct labour overhead rate = Total factory overheads/Total
direct labour hours
=$282,100/2,170 hours = $130/hour
(b)Machine hour overhead rate = Total factory overheads/Total
Machine hours
= $282,100/3,100 hours= $91/hour
2
(a) direct labour hour plantwide factory overhead rate
Whole milk= (330+390) hours * $130/hour = $93,600
Skim Milk= (360+620) hours * $130/hour = $127,400
Cream= (290+180) hours * $130/hour = $61,100
(b) machine hour plantwide factory overhead rate
Whole milk= (780+510) hours * $91/hour = $117,390
Skim Milk= (710+630) hours * $91/hour = $121,940
Cream= (280+190) hours * $91/hour = $42,770