Figure 7-4.
The controller has collected the expected annual prime costs for
each product, the machine hours, the setup hours, and the expected
production.
|
1. Refer to Figure 7-4. Calculate Beaker's consumption ratio for setup hours.
|
2. Refer to Figure 7-4. Calculate the overhead cost per unit for Bunsen Laptops, using a plantwide rate based on direct labor costs.
|
3. Refer to Figure 7-4. Calculate the overhead cost per unit for each Beaker Computer, using overhead rates based on machine hours and setup hours.
|
Get Answers For Free
Most questions answered within 1 hours.