Question

29.30 Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,300 Training of machine...

29.30

Schedule of Activity Costs
Quality Control Activities Activity Cost
Process audits $49,300
Training of machine operators 28,100
Processing returned products 17,900
Scrap processing (disposal) 26,200
Rework 8,700
Preventative maintenance 27,900
Product design 40,100
Warranty work 7,900
Finished goods inspection 22,700

From the above schedule of activity costs, determine the prevention costs.

a.$96,100

b.$56,000

c.$114,000

d.$104,800

--------------

Schedule of Activity Costs
Quality Control Activities Activity Cost
Process audits $49,400
Training of machine operators 25,400
Processing returned products 18,400
Scrap processing (disposal) 24,100
Rework 7,900
Preventative maintenance 29,500
Product design 42,200
Warranty work 7,600
Finished goods inspection 22,900

From the above schedule of activity costs, determine the value-added costs.

a.$169,400

b.$227,400

c.$146,500

d.$177,000

Homework Answers

Answer #1

1

Option A)

Value-added costs. =$96100

Working notes for the above answer is as under

Training Of Machine Operators

28100

Preventive Maintenances

27900

Product Design

40100

the prevention costs

96100

____________________________________________________________________

2

Option A)

the prevention costs =$169,400

Working notes for the above answer is as under

Activity Cost

Process audits

49400

Training of machine operators

25400

Preventative maintenance

29500

Product design

42200

Finished goods inspection

22900

value added costs

169400

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
7. Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,800 Training of machine...
7. Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,800 Training of machine operators 28,400 Processing returned products 16,900 Scrap processing (disposal) 25,600 Rework 5,600 Preventative maintenance 31,800 Product design 43,900 Warranty work 6,400 Finished goods inspection 22,800 From the above schedule of activity costs, determine the prevention costs. a.$60,200 b.$109,700 c.$104,100 d.$121,000
Quality Control Activities Activity Cost Process audits $49,700 Training of machine operators 27,700 Processing returned products...
Quality Control Activities Activity Cost Process audits $49,700 Training of machine operators 27,700 Processing returned products 16,000 Scrap processing (disposal) 24,400 Rework 6,400 Preventative maintenance 27,100 Product design 43,500 Warranty work 7,000 Finished goods inspection 22,000 From the above schedule of activity costs, determine the external failure costs.
Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $50,000 Training of machine operators...
Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $50,000 Training of machine operators 28,000 Processing returned products 19,000 Scrap processing (disposal) 25,000 Rework 8,000 Preventive maintenance 30,000 Product design 46,000 Warranty work 12,000 Finished goods inspection 23,000 ​ 1. From the provided schedule of activity costs, determine the non-value-added costs. a. $30,000 b. $50,000 c. $64,000 d. $85,000 2. From the provided schedule of activity costs, determine the prevention costs. On test a. $30,000 b. $74,000 c....
Schedule of Activity Costs Quality Control Activities Activity Cost Product testing $55,000 Assessing vendor quality 26,000...
Schedule of Activity Costs Quality Control Activities Activity Cost Product testing $55,000 Assessing vendor quality 26,000 Recalls 18,000 Rework 29,000 Scrap disposal   8,000 Product design 30,000 Training machine operators 46,000 Warranty work 12,000 Process audits 22,000 From the above schedule, calculate the internal failure costs. $
MANAGERIAL ACCOUNTING Q1: The Klamath Corp. produces two products, saws and drills. Three activities are used...
MANAGERIAL ACCOUNTING Q1: The Klamath Corp. produces two products, saws and drills. Three activities are used in their manufacture. These activities and their associated costs and bases are as follows: Activity Budgeted Costs Activity Base Stamping $200,000 Machine hours Assembly $400,000 Labor hours Setup $30,000 Number of setups Activity Base Saws Drills Total Machine hours 4,000 6,000 10,000 Labor hours 7,000 13,000 20,000 Number of setups        3        12        15 Units produced     500     600 a. Determine the activity rate for each...
Name: ________________________________________ How does Activity Based Costing differ from the traditional overhead allocation system? _______________________________________________________________________________________________________________________
Name: ________________________________________ How does Activity Based Costing differ from the traditional overhead allocation system? __________________________________________________________________________________________________________________________________________________________________________ Quality Management: Type of Quality Cost Voluntary or Failure? Type? Downtime Reliability testing Warranty Product design Training costs Scrap Customer relations Inventory inspection Downtime Re-inspection Repair and rework Identify 3 products that would use Job order costing: (1)_____________________________________________ (2) _____________________________________________ (3)_____________________________________________ Identify 3 products that would use process costing: 1)_____________________________________________ (2) _____________________________________________ (3)_____________________________________________
An example of an Appraisal Quality cost is: A. rework costs B. reliability testing C. promotion...
An example of an Appraisal Quality cost is: A. rework costs B. reliability testing C. promotion and awards to employee D. warranty repairs and replacement costs E. None of the above When considering whether to accept a special one-time order at a discounted price, in additional to making a quantitative analysis (analyzing costs and revenue implications), a qualitative (nonfinancial) analysis should also be made to consider the impact on: A. the practicality of your product B. your irrelevant costs C....
Urban Elite Cosmetics has used a traditional cost accounting system to apply quality-control costs uniformly to...
Urban Elite Cosmetics has used a traditional cost accounting system to apply quality-control costs uniformly to all products at a rate of 18 percent of direct-labor cost. Monthly direct-labor cost for Satin Sheen makeup is $111,000. In an attempt to more equitably distribute quality-control costs, management is considering activity-based costing. The monthly data shown in the following chart have been gathered for Satin Sheen makeup. Activity Cost Pool Cost Driver Pool Rates Quantity of Driver for Satin Sheen Incoming material...
Case Abstract: Company ABC, an AE, constructor and construction management firm, recently assigned Bob Ironside to...
Case Abstract: Company ABC, an AE, constructor and construction management firm, recently assigned Bob Ironside to turn a major coal fired generating station project around. Currently at 36 percent construction completion, the project is shifting from an emphasis on civil and structural work to bulk production. Cooperation of the owner, the multi-prime contractors, and strong labor unions is cach vital for performance improvement. The analysis of this project involves: 1) identification of significant external influences on the project organization, 2)...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT
Active Questions
  • If 133.2 kJ of heat are added to 5.80 × 102 g of water at 22.0°C,...
    asked 1 minute ago
  • true/false An unweighted path length measures the number of edges in a graph. Breadth first search...
    asked 9 minutes ago
  • Give an example of the effect of interest rate changes on a fixed coupon bond, what...
    asked 17 minutes ago
  • Thirty-two small communities in Connecticut (population near 10,000 each) gave an average of x = 138.5...
    asked 21 minutes ago
  • The value of the integral   ∫C(3x2+ycosx)dx+(sinx−4y3)dy∫C(3x2+ycos⁡x)dx+(sin⁡x−4y3)dy, where CC is an arbitrary path from A(−π,−1)A(−π,−1) to B(2π,1)B(2π,1),...
    asked 35 minutes ago
  • the ordinates of a 6-h unit hydrograph for a particular catchment are 0,10,30,50,40,30,20,10 and 0 m3/s...
    asked 36 minutes ago
  • Please solve this using R code Part 3: A particular item is handmade in two stages...
    asked 45 minutes ago
  • Compare the American Cousnelors Association (ACA) code of ethics regarding conflict of interest to the National...
    asked 45 minutes ago
  • A fisherman's scale stretches 3.2 cm when a 2.1 kg fish hangs from it. a) What...
    asked 59 minutes ago
  • Compare the American Counselors Association (ACA) code of ethics regarding referral due to dual relationship possibility...
    asked 1 hour ago
  • Sexual harassment in the United States has become a very explosive issue, from the entertainment industry...
    asked 1 hour ago
  • Height 162.5 175.5 160 175 158 163 186 165 155 165 172 168 175.5 158 188.5...
    asked 2 hours ago