Question

Free Manufacturing Company (FMC) is based in San Diego California. FMC wants to determine the cost...

Free Manufacturing Company (FMC) is based in San Diego California. FMC wants to determine the cost of quality for the products manufactured.
Using the provided data, complete the Cost of Quality (COQ) Report by answering the following question
Costs Allocation Rate Quantity of Costs Allocation Base
Customer Support 60 per hour 10,000 hours
Design Engineering 100 per hour 5,000 hours
Inspection (manufacturing) 50 per hour 40,000 hours
Process Engineering 80 per hour 6,000 hours
Rework 100 per hour 10,000 hours
Transportation 300 per hour 4,000 loads
Warranty Repair 100 per hour 10,000 hours
Revenue 50,000,000
Required:
1). Categorize the costs into: Prevention, Appraisal, Internal Failure, and External Failure Costs
2). Compute the total costs for each category. Round answers to four decimal points.
3). Compute the percentage of revenue for each category. Round answers to four decimal points.
4). Compute the Total Costs of Quality. Round answers to four decimal points.

Homework Answers

Answer #1
Preventive Appraisal Internal Failure External Failure
Customer Support 600000
Design Engineering 500000
Inspection 2000000
Process Engineering 480000
Rework 1000000
Transportation 1200000
Warranty Repair 1000000
1580000 2000000 2200000 1000000
Revenue 50000000 50000000 50000000 50000000
% 3.16% 4.00% 4.40% 2.00%
Total Cost of Quality
Customer Support 600000
Design Engineering 500000
Inspection 2000000
Process Engineering 480000
Rework 1000000
Transportation 1200000
Warranty Repair 1000000
6780000
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
Problem 15-33 (Algorithmic) Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This...
Problem 15-33 (Algorithmic) Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This addition will bring the number of machines to nine. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The arrival rate is 0.06 machines per hour for each machine, and the service rate for each individual assigned to the repair operation is 0.6 machines per hour. Compute the operating characteristics if the company...
Problem 15-33 (Algorithmic) Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This...
Problem 15-33 (Algorithmic) Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This addition will bring the number of machines to ten. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The arrival rate is 0.07 machines per hour for each machine, and the service rate for each individual assigned to the repair operation is 0.6 machines per hour. Compute the operating characteristics if the company...
Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This addition will bring...
Kolkmeyer Manufacturing Company is considering adding two machines to its manufacturing operation. This addition will bring the number of machines to nine. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The arrival rate is 0.06 machines per hour for each machine, and the service rate for each individual assigned to the repair operation is 0.6 machines per hour. Compute the operating characteristics if the company retains the single-employee...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials handling Number of parts $ 0.60 Machinery Number of machine hours 51.00 Assembly Number of parts 2.85 Inspection Number of finished units 30.00 Drilling has just completed 80 units of a component for a customer. Each unit required 100 parts and 3 machine hours. The prime cost is $1,300 per finished unit. All other manufacturing costs are classified as manufacturing overhead. Required: 1. Compute...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic      Advanced      Total Units produced         80,000         240,000         — Prime costs         $6,240,000         $24,960,000         $31,200,000 Machine hours         80,000         400,000         480,000 Engineering hours         500         4,500         5,000 Receiving orders         200         600         800 Inspection hours        ...
The building maintenance department for the Steering Manufacturing Company budgets annual costs of $5,402,000 based on...
The building maintenance department for the Steering Manufacturing Company budgets annual costs of $5,402,000 based on the expected operating level for the coming year. The costs are allocated to two production departments. Steering is considering two allocation bases for assignment of costs to departments: (1) square footage and (2) direct labor hours. The following data relate to the potential allocation bases: Production Dept. 1 Production Dept. 2 Square footage 31,660 41,340 Direct labor hours 41,340 31,660 Calculate the costs allocated...
Direct Method, Reciprocal Method, Overhead Rates Macalister Corporation is developing departmental overhead rates based on direct...
Direct Method, Reciprocal Method, Overhead Rates Macalister Corporation is developing departmental overhead rates based on direct labor hours for its two production departments—Molding and Assembly. The Molding Department employs 23 people, and the Assembly Department employs 81 people. Each person in these two departments works 2,010 hours per year. The production-related overhead costs for the Molding Department are budgeted at $238,000, and the Assembly Department costs are budgeted at $91,000. Two support departments—Engineering and General Factory—directly support the two production...
Marquis Company estimates that annual manufacturing overhead costs will be $822,600. Estimated annual operating activity bases...
Marquis Company estimates that annual manufacturing overhead costs will be $822,600. Estimated annual operating activity bases are direct labor cost $457,000, direct labor hours 45,700, and machine hours 91,400. Compute the predetermined overhead rate for each activity base. (Round answers to 2 decimal places, e.g. 10.50% or 10.50.) Overhead rate per direct labor cost Overhead rate per direct labor hour Overhead rate per machine hour
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials...
Drilling Company uses activity-based costing and provides this information: Manufacturing Activity Cost Driver Driver Rate Materials handling Number of parts $ 0.3 Machinery Number of machine hours 56 Assembly Number of parts 3.10 Inspection Number of finished units 35 Drilling has just completed 85 units of a component for a customer. Each unit required 105 parts and 3.25 machine hours. The prime cost is $1,350 per finished unit. All other manufacturing costs are classified as manufacturing overhead. Required: 1. Compute...