Question

San Juan, Inc. is considering two alternatives: A and B. The costs associated with the alternatives...

San Juan, Inc. is considering two alternatives: A and B. The costs associated with the alternatives are listed below:

Alternative A Alternative B
Material costs $ 35,000 $ 60,000
Processing costs 40,000 60,000
Building costs 13,100 30,000
Equipment rental 20,100 20,100


If only the differential costs of the two decisions are considered, the total cost of Alternative B is

$139,150.

$61,900.

$108,200.

$170,100.

Homework Answers

Answer #1

Costs Alternative A:

Material costs $ 35,000

Processing costs 40,000

Building costs 13,100

Total= $88100

---------------------------------------------------------

Costs Alternative B:

Material costs $ 60,000

Processing costs $60,00

Building costs $30,000

Total= $150,000

----------------------------------------------------------------

Total differential cost = 150000 - 88100 = $61900

----------------------------------------------------------------

Explanation:

The cost which is same in both the alternatives, i.e Equipment rental, will not be considered in calculating the cost.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed...
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below: Alternative Q Alternative R Supplies costs $ 65,000 $ 65,000 Power costs $ 30,000 $ 29,000 Inspection costs $ 18,000 $ 29,000 Assembly costs $ 33,000 $ 33,000 a. Which costs are relevant and which are not relevant in the choice between these two alternatives? b. What is the differential cost between the two alternatives?
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed...
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below:    Alternative Q Alternative R Supplies costs $ 91,000 $ 91,000 Power costs $ 55,000 $ 54,200 Inspection costs $ 47,000 $ 54,200 Assembly costs $ 56,000 $ 56,000 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? Supplies Costs: relevant or not relevant? Power Costs: relevant or not relevant? Inspection Costs: relevant or...
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the...
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding Department. Other parts and the subassembly are then assembled in the Assembly Department. The activities, expected costs, and drivers associated with these two manufacturing processes are given below. Process Activity Cost Activity Driver Expected Quantity Cutting and Welding Welding $ 776,000    Welding hours 4,000 Machining 450,000    Machine hours 10,000 Inspecting 448,250    No. of inspections 1,000 Materials handling 300,000...