Question

Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a...

Stage 1 ABC For Machine Shop: Assigning Costs to Activity
As the chief engineer of a small fabrication shop, Christine Ford refers to herself as a “jack-of-all-trades.” When an order for a new product comes in, Christine must do the following:

1. Design the product to meet customer requirements.
2. Prepare a bill of materials (a list of materials required to produce the product).
3. Prepare an operations list (a sequential list of the steps involved in manufacturing the product).

Each time the foundry manufactures a batch of the product, Christine must perform these activities:
1. Schedule the job.
2. Supervise the setup of machines that will work on the job.
3. Inspect the first unit produced to verify that it meets specifications.

Christine supervises the production employees who perform the actual work on individual units of product. She is also responsible for employee training, ensuring that production facilities are in proper operating condition, and attending professional meetings. Christine's estimates (in percent) of time spent on each of these activities last year are as follows:

Designing product 12%
Preparing bills of materials 7%
Preparing operations lists 10%
Scheduling jobs 16%
Supervising setups 8%
Inspecting first units 6%
Supervising production 22%
Training employees 13%
Maintaining facility 4%
Attending professional meetings 2%
100%

Assuming Christine Ford’s salary is $85,000 per year, determine the dollar amount of her salary assigned to unit-, batch-, product-, and facility-level activities. (You may need to review Chapter 2 before answering this question.)

% of Time Spent on Activity Assignment of Salary
Unit level:
AnswerAttending professional meetingsFacility maintenanceFirst unit inspectionPreparing bills of materialsPreparing operations listsSupervising productionSupervising setup Answer %
Total Answer % $Answer
Batch level:
Job scheduling Answer %
AnswerAttending professional meetingsFacility maintenancePreparing bills of materialsPreparing operations listsSupervising productionSupervising setup Answer %
AnswerAttending professional meetingsFacility maintenanceFirst unit inspectionPreparing bills of materialsPreparing operations listsSupervising production Answer %
Total Answer % Answer
Product level:
Product design Answer %
AnswerAttending professional meetingsFacility maintenanceFirst unit inspectionPreparing bills of materialsSupervising productionSupervising setup Answer %
AnswerAttending professional meetingsFacility maintenanceFirst unit inspectionPreparing operations listsSupervising productionSupervising setup Answer %
Total Answer % Answer
Facility level:
Employee training Answer %
AnswerFacility maintenanceFirst unit inspectionPreparing bills of materialsPreparing operations listsSupervising productionSupervising setup Answer %
AnswerAttending professional meetingsFirst unit inspectionPreparing bills of materialsPreparing operations listsSupervising productionSupervising setup Answer %
Total Answer % Answer
Grand total Answer % $Answer

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information...
Two-Stage ABC for Manufacturing with Variances Montreat Manufacturing has developed the following activity cost pool information for its 2016 manufacturing activities: Budgeted Activity Cost Activity Cost Driver at Practical Capacity Purchasing and materials handling $675,000 900,000 kilograms Setup 700,000 1,120 setups Machine operations 954,000 12,000 hours First unit inspection 50,000 1,000 batches Packaging 250,000 312,500 units Actual 2016 production information is as follows: Standard Product A Standard Product B Specialty Products Units 150,000 100,000 50,000 Batches 100 80 600 Setups*...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following activity cost information for its manufacturing activities: Activity Activity Cost Machine setup $70.00 per batch Movement 20.00 per batch 0.10 per pound Drilling 3.00 per hole Welding 8.00 per inch Shaping 29.00 per hour Assembly 18.00 per hour Inspection 2.00 per unit Filling an order for a batch of 50 fireplace inserts that weighed 150 pounds each required the following: • Three batch moves...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following...
Two-Stage ABC for Manufacturing: Reassigning Costs to Cost Objectives National Technology, LTD. has developed the following activity cost information for its manufacturing activities: Activity Activity Cost Machine setup $60.00 per batch Movement 15.00 per batch 0.10 per pound Drilling 3.00 per hole Welding 4.00 per inch Shaping 25.00 per hour Assembly 18.00 per hour Inspection 2.00 per unit Filling an order for a batch of 50 fireplace inserts that weighed 100 pounds each required the following: • Four batch moves...
1. Activity Cost Pool Activity Measure Estimated Overhead Costs Expected Activity Machine Setup Number of Setups...
1. Activity Cost Pool Activity Measure Estimated Overhead Costs Expected Activity Machine Setup Number of Setups                                         20,000                                        50 Special Processing Machine Hours                                       200,000                                  8,000 General Factory Direct labor Hours                                       250,000                               12,500 Calculate the activity rate for the following: Machine Setup: ____________ Special Processing: ____________ General Factory: ____________ 2. Product A Product B Product C Direct Labor Costs $    40,000.00 $ 190,000.00 $ 50,000.00 Direct Materials $ 100,000.00 $ 120,000.00 $ 60,000.00 Number of Setups...
After reading an article about activity-based costing in a trade journal for the furniture industry, Santana...
After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey wondered if it was time to critically analyze overhead costs at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of its overhead. Additional information about overhead follows. Activity Cost Driver Setting up machines $ 18,750 25 batches Inspecting components $ 5,200 5,200 parts Providing utilities $ 10,400 5,200 machine hours Overhead has...
After reading an article about activity-based costing in a trade journal for the furniture industry, Santana...
After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey wondered if it was time to critically analyze overhead costs at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of its overhead. Additional information about overhead follows. Activity Cost Driver Setting up machinfes $ 24,030 27 batches Inspecting components $ 4,800 4,800 parts Providing utilities $ 9,600 4,800 machine hours Overhead has...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of a specific product in the past three years. Quarter Year 1 2 3 4 2015 350 254 176 228 2016 367 258 169 236 2017 342 250 166 228 Predict demand in quarter 1 and quarter 2 of 2018, given that the demand forecast for the whole year is a total of 1,040 units. Question 6: DRP (8 p) A central DC supplies a...
1. Aztec Builders allocates manufacturing overhead to jobs based on machine hours. The company has the...
1. Aztec Builders allocates manufacturing overhead to jobs based on machine hours. The company has the following estimated costs for the upcoming year: Direct materials used $25,000 Direct labour costs $62,000 Salary of factory supervisor $50,000 Advertising expense $33,000 Heating and lighting costs for factory $51,000 Depreciation on factory equipment $19,000 Sales commissions $8,000 The firm estimates that 1,800 direct labour hours will be worked in the upcoming year, while 2,000 machine hours will be used during the year. The...
1. During a problem-solving session, participants make a number of statements during the “identify the problem”...
1. During a problem-solving session, participants make a number of statements during the “identify the problem” phase of the process. Some of the statements reflect the actual problem. Others are merely symptoms of the problem. Select the statement(s) that represent the actual problem. Select all that apply. a. “Three customers complained this week that the packages they received from our new carrier were damaged in transit. This is the highest number of complaints we have ever had in a week.”...