Question

If the actual level of activity is 4% more than planned, then the costs in the...

If the actual level of activity is 4% more than planned, then the costs in the static budget should be increased by 4% before comparing them to actual costs.

True or False

a) If you answered true, explain why it is true or the paragraph and page number of the textbook on which you are basing your response.

OR

b) If you answered false, explain what is false about the question or how it could be changed to make it a true statement.

Homework Answers

Answer #1

Answer)

My answer would be false.

b)A Static budget is a type of budget that contains all the anticipated values about inputs and outputs that are recorded in previous period.Hence,we should not change the values in static budget as it just budgeted not only for costs but also for planned level of activity also.Hence,we cannot change it with actuals.

IMy answer would be true if the statement be like if the actual level of activity is 4% more than planned, then the costs in the static budget needn't be changed before comparing them to actual costs

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
True Or False 1- Fixed costs should not be included in a flexible budget because they...
True Or False 1- Fixed costs should not be included in a flexible budget because they do not change when the level of activity changes. (       ) 2-To help assess how well a manager has controlled costs, actual costs should be compared to what the costs should have been for the actual level of activity. (       ) 3-The activity variance for revenue is favorable if the actual revenue for the period exceeds the revenue in the static planning budget. (      ...
Spark Company's static budget is based on a planned activity level of 36,000 units. At the...
Spark Company's static budget is based on a planned activity level of 36,000 units. At the same time the static budget was prepared, the management accountant prepared two additional budgets, one based on 31,000 units and one based on 41,000. The company actually produced and sold 40,000 units. In evaluating its performance, management should compare the company's actual revenues and costs to which of the following budgets? A budget based on 40,000 units A budget based on 36,000 units A...
1) A budget prepared at a single volume of activity is referred to as a: A)...
1) A budget prepared at a single volume of activity is referred to as a: A) Strategic budget. B) Standard budget. C) Static budget. D) Flexible budget. Answer:  ___________ 2) Select the incorrect statement regarding flexible budgets. A) Flexible budgets often show the estimated revenues and costs at multiple volume levels. B) A flexible budget is used to compare actual to budgeted amounts. C) A flexible budget is also known as a master budget. D) Standard prices and costs are used...
Financial Versus Activity Flexible Budgeting Kelly Gray, production manager, was upset with the latest performance report,...
Financial Versus Activity Flexible Budgeting Kelly Gray, production manager, was upset with the latest performance report, which indicated that she was $100,000 over budget. Given the efforts that she and her workers had made, she was confident that they had met or beat the budget. Now, she was not only upset but also genuinely puzzled over the results. Three items—direct labor, power, and setups—were over budget. The actual costs for these three items follow: Actual Costs Direct labor $188,330      Power...
Score for this attempt: 69 out of 75 Submitted Apr 10 at 10:59am This attempt took...
Score for this attempt: 69 out of 75 Submitted Apr 10 at 10:59am This attempt took 74 minutes. Question 1 1.5 / 1.5 pts Process manufacturing usually reflects a manufacturer that produces small quantities of unique items.    True Correct!   False Question 2 1.5 / 1.5 pts On a common-sized income statement, all items are stated as a percent of total assets or equities at year-end. Correct!   False     True Question 3 1.5 / 1.5 pts A single plantwide overhead...
True or False—Indicate if the statement is True (T) or False (F) for each of the...
True or False—Indicate if the statement is True (T) or False (F) for each of the following 10 statements: __________ 1. The variances between actual operating results and the initial static budget are almost always made up of both a volume variance and a flexible budget variance as actual volume often varies from planned volume and actual costs differ from budgeted cost. __________ 2. The variances are considered to be unfavorable when actual costs exceed budgeted costs and actual sales...
Lab 5 Queries with Multiple Tables In this lab, we do queries more than one table....
Lab 5 Queries with Multiple Tables In this lab, we do queries more than one table. SQL provides two different techniques for querying data from multiple tables: • The SQL subquery • The SQL join As you will learn, although both work with multiple tables, they are used for slightly different purposes. We used WMCRM database which is what we created in Lab 4. Here is the summary of the database schema (where schema is used in its meaning of...
The premium paid on an option contract (either a put or a call) represents the compensation...
The premium paid on an option contract (either a put or a call) represents the compensation the buyer of the option receives from the seller (writer) of the option for the ability to use the option if it becomes profitable. If the buyer of the option does not use the option before expiration, this premium must be returned back to the seller (writer) at the time the option expires. True False 2 points    QUESTION 3 On the day of...
Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a...
Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Christine Ford refers to herself as a “jack-of-all-trades.” When an order for a new product comes in, Christine must do the following: 1. Design the product to meet customer requirements. 2. Prepare a bill of materials (a list of materials required to produce the product). 3. Prepare an operations list (a sequential list of the steps involved in manufacturing the product)....
Background Sarah’s project had now become more complex than she had anticipated. Sarah’s company had a...
Background Sarah’s project had now become more complex than she had anticipated. Sarah’s company had a philosophy that the project manager would be assigned during proposal preparation, assist in the preparation of the proposal, and take on the role of the project manager after contract award, assuming the company would be awarded the contract. Usually, contract go-ahead would take place within a week or two after contract award. That made project staffing relatively easy for most of the project managers....