Activity-Based Costing: Factory Overhead Costs
The total factory overhead for Bardot Marine Company is budgeted for the year at $1,344,900, divided into four activities: fabrication, $672,000; assembly, $234,000; setup, $239,400; and inspection, $199,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity-base usage quantities for each product by each activity are as follows:
FabricationAssemblySetupInspection
Speedboat10,500dlh29,250dlh76setups131inspections
Bass boat31,500 9,750 554 919
42,000dlh39,000dlh630setups1,050inspections
Each product is budgeted for 4,000 units of production for the year.
a. Determine the activity rates for each activity.
Fabrication$ per direct labor hour
Assembly$ per direct labor hour
Setup$ per setup
Inspection$ per inspection
b. Determine the activity-based factory overhead per unit for each product. Round to the nearest whole dollar.
Speedboat$ per unit
Bass boat$ per unit
a. | ||
Activity rates | ||
Fabrication [ 672000/42000 ] | 16 | per direct labor hour |
Assembly [ 234000 / 39000 ] | 6 | per direct labor hour |
Setup [ 239400/630 ] | 380 | per setup |
Inspection [ 199500 / 1050 ] | 190 | per inspection |
b. | ||
Speedboat | Bass boat | |
Overhead allocation : | ||
Fabrication | 168000 | 504000 |
Assembly [ 234000 / 39000 ] | 175500 | 58500 |
Setup [ 239400/630 ] | 28880 | 210520 |
Inspection [ 199500 / 1050 ] | 24890 | 174610 |
Total overhead allocated | 397270 | 947630 |
(/) Budgeted units of production | 4000 | 4000 |
activity-based factory overhead per unit | 99 | 237 |